MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
297
Sanctioned (pure scheme)
₹2.45 Cr
Expenditure since inception
₹2.27 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
13 works
₹41.07 L sanctioned
₹52.93 L spent (129%)
02
Rural Housing
194 works
₹37.79 L sanctioned
₹37.30 L spent (99%)
03
Plantation
8 works
₹26.73 L sanctioned
₹10.13 L spent (38%)
04
Farm Pond
6 works
₹19.96 L sanctioned
₹15.34 L spent (77%)
05
Constr of Cement Concrete Roads
15 works
₹19.00 L sanctioned
₹15.86 L spent (84%)
06
Construction of Trench
9 works
₹15.44 L sanctioned
₹15.83 L spent (103%)
07
Repair & maint of Road
1 works
₹14.98 L sanctioned
₹14.22 L spent (95%)
08
Constr of GP Bhawan
1 works
₹12.85 L sanctioned
₹5.05 L spent (39%)
09
Construction of Well
14 works
₹10.80 L sanctioned
₹15.31 L spent (142%)
10
Construction of Check Dam/Stop Dam
1 works
₹9.30 L sanctioned
₹7.34 L spent (79%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 194 37.79 37.30
99%
2 Constr of Cement Concrete Roads 15 19.00 15.86
84%
3 Construction of Well 14 10.80 15.31
142%
4 Construction of Road and Culvert 13 41.07 52.93
129%
5 Land Development 11 1.08 5.45
505%
6 Construction of Toilets 9 0.49 0.48
100%
7 Construction of Trench 9 15.44 15.83
103%
8 Plantation 8 26.73 10.13
38%
9 Farm Pond 6 19.96 15.34
77%
10 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 7.30 7.18
98%
11 Cattle Shed 2 2.24 1.11
50%
12 Boulder Check/Gully Plug 1 0.00 2.01
0%
13 Community Sanitary Complex 1 0.44 0.43
99%
14 Constr of GP Bhawan 1 12.85 5.05
39%
15 Construction of building/workshed for SHG 1 6.68 6.65
100%
16 Construction of Check Dam/Stop Dam 1 9.30 7.34
79%
17 Construction of Crematorium 1 1.80 1.81
101%
18 Construction of Embankment 1 4.43 3.87
87%
19 Construction of NADEP/Vermi Compost Pit 1 0.16 0.14
92%
20 Construction of Percolation Tank 1 3.10 3.10
100%
21 Renovation of traditional water bodies 1 4.95 2.91
59%
22 Repair & maint of Pond/ Tank 1 3.69 2.43
66%
23 Repair & maint of Road 1 14.98 14.22
95%
24 Solid and Liquid Waste Management 1 0.53 0.52
98%
Total 297 244.80 227.41
All 24 rows (zero-value rows hidden) ⇩ Export to Excel