MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
210
Sanctioned (pure scheme)
₹3.35 Cr
Expenditure since inception
₹3.10 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
30 works
₹93.72 L sanctioned
₹42.38 L spent (45%)
02
Construction of Percolation Tank
4 works
₹58.48 L sanctioned
₹54.76 L spent (94%)
03
Construction of Check Dam/Stop Dam
15 works
₹57.36 L sanctioned
₹95.80 L spent (167%)
04
Constr of Cement Concrete Roads
14 works
₹26.28 L sanctioned
₹17.07 L spent (65%)
05
Construction of Trench
4 works
₹15.34 L sanctioned
₹13.82 L spent (90%)
06
Rural Housing
74 works
₹14.34 L sanctioned
₹13.55 L spent (94%)
07
Construction of Road and Culvert
13 works
₹13.63 L sanctioned
₹22.08 L spent (162%)
08
Construction of Tank
5 works
₹11.60 L sanctioned
₹9.91 L spent (85%)
09
Farm Pond
7 works
₹8.65 L sanctioned
₹5.89 L spent (68%)
10
Construction of Well
2 works
₹6.75 L sanctioned
₹6.72 L spent (100%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 74 14.34 13.55
95%
2 Plantation 30 93.72 42.38
45%
3 Construction of Toilets 16 3.96 3.93
99%
4 Construction of Check Dam/Stop Dam 15 57.36 95.80
167%
5 Constr of Cement Concrete Roads 14 26.28 17.07
65%
6 Construction of Road and Culvert 13 13.63 22.08
162%
7 Farm Pond 7 8.65 5.89
68%
8 Construction of Tank 5 11.60 9.91
85%
9 Construction of Percolation Tank 4 58.48 54.76
94%
10 Roof Water Harvesting on gov/panchayat bldg 4 0.22 0.14
63%
11 Construction of Trench 4 15.34 13.82
90%
12 Construction of NADEP/Vermi Compost Pit 3 0.43 0.42
98%
13 Constr of Aganwadi 3 2.53 2.55
101%
14 Construction of Bund 3 4.11 4.03
98%
15 Boulder Check/Gully Plug 2 0.99 0.86
88%
16 Construction of Well 2 6.75 6.72
100%
17 Land Development 2 1.51 1.16
77%
18 Solid and Liquid Waste Management 2 0.55 0.48
88%
19 Repair & maint of Pond/ Tank 1 1.75 1.63
93%
20 Terracing 1 1.55 1.51
97%
21 Construction of Crematorium 1 1.80 1.80
100%
22 Construction of Recharge Pits 1 0.05 0.00
3%
23 Construction of Play field 1 3.53 3.59
102%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 5.78 5.76
100%
25 Culvert 1 0.00 0.19
0%
Total 210 334.91 310.04