MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
176
Sanctioned (pure scheme)
₹2.80 Cr
Expenditure since inception
₹3.23 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
3 works
₹66.35 L sanctioned
₹64.82 L spent (98%)
02
Construction of Road and Culvert
16 works
₹40.51 L sanctioned
₹80.80 L spent (199%)
03
Construction of Check Dam/Stop Dam
3 works
₹37.16 L sanctioned
₹74.18 L spent (200%)
04
Farm Pond
4 works
₹22.61 L sanctioned
₹21.94 L spent (97%)
05
Rural Housing
103 works
₹21.87 L sanctioned
₹19.14 L spent (87%)
06
Constr of Cement Concrete Roads
11 works
₹13.90 L sanctioned
₹15.02 L spent (108%)
07
Construction of Tank
2 works
₹11.11 L sanctioned
₹5.29 L spent (48%)
08
Plantation
4 works
₹8.70 L sanctioned
₹4.10 L spent (47%)
09
Construction of Toilets
6 works
₹8.42 L sanctioned
₹6.75 L spent (80%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹8.37 L sanctioned
₹5.26 L spent (63%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 103 21.87 19.14
88%
2 Construction of Road and Culvert 16 40.51 80.80
200%
3 Constr of Cement Concrete Roads 11 13.90 15.02
108%
4 Construction of Recharge Pits 7 2.38 1.45
61%
5 Construction of Toilets 6 8.42 6.75
80%
6 Plantation 4 8.70 4.10
47%
7 Farm Pond 4 22.61 21.94
97%
8 Construction of Check Dam/Stop Dam 3 37.16 74.18
200%
9 Constr of Aganwadi 3 6.70 6.67
100%
10 Construction of Percolation Tank 3 66.35 64.82
98%
11 Construction of Trench 2 6.69 0.76
11%
12 Construction of Play field 2 7.06 3.49
49%
13 Land Development 2 3.01 4.80
160%
14 Construction of Crematorium 2 4.60 4.00
87%
15 Construction of Tank 2 11.11 5.29
48%
16 Well Recharge 1 0.30 0.30
99%
17 Constr of Kitchen Shed 1 0.36 0.23
63%
18 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 8.37 5.26
63%
19 Renovation of traditional water bodies 1 7.32 1.85
25%
20 Repair & maint of Pond/ Tank 1 2.16 1.75
81%
21 Cattle Shed 1 0.87 0.67
77%
Total 176 280.44 323.25
All 21 rows (zero-value rows hidden) ⇩ Export to Excel