Works completed
225
Sanctioned (pure scheme)
₹2.86 Cr
Expenditure since inception
₹2.55 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
39 works
₹1.14 Cr sanctioned
₹1.29 Cr spent (114%)
02
Construction of Tank
6 works
₹32.92 L sanctioned
₹30.73 L spent (93%)
03
Plantation
12 works
₹29.12 L sanctioned
₹12.14 L spent (42%)
04
Rural Housing
80 works
₹22.41 L sanctioned
₹13.93 L spent (62%)
05
Farm Pond
3 works
₹13.50 L sanctioned
₹12.88 L spent (95%)
06
Constr of Cement Concrete Roads
7 works
₹11.84 L sanctioned
₹10.59 L spent (89%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹9.14 L sanctioned
₹6.72 L spent (73%)
08
Land Development
7 works
₹7.66 L sanctioned
₹5.33 L spent (70%)
09
Construction of Spur
1 works
₹6.98 L sanctioned
₹5.82 L spent (83%)
10
Construction of Percolation Tank
2 works
₹6.60 L sanctioned
₹5.66 L spent (86%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 80 0.22 0.14
62%
2 Construction of Road and Culvert 39 1.14 1.29
114%
3 Solid and Liquid Waste Management 29 0.02 0.01
92%
4 Plantation 12 0.29 0.12
42%
5 Construction of NADEP/Vermi Compost Pit 7 0.02 0.01
49%
6 Constr of Cement Concrete Roads 7 0.12 0.11
89%
7 Roof Water Harvesting on gov/panchayat bldg 7 0.02 0.02
82%
8 Land Development 7 0.08 0.05
70%
9 Construction of Tank 6 0.33 0.31
93%
10 Construction of Check Dam/Stop Dam 6 0.01 0.01
82%
11 Cattle Shed 3 0.03 0.02
78%
12 Construction of Trench 3 0.06 0.05
85%
13 Farm Pond 3 0.14 0.13
95%
14 Construction of Percolation Tank 2 0.07 0.06
86%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.09 0.07
74%
16 Bio-Fertilizer 1 0.00 0.00
76%
17 Constr of Aganwadi 1 0.02 0.02
98%
18 Constr of Kitchen Shed 1 0.00 0.00
86%
19 Construction of Bund 1 0.01 0.00
28%
20 Construction of Crematorium 1 0.02 0.02
100%
21 Construction of Recharge Pits 1 0.00 0.00
70%
22 Construction of Spur 1 0.07 0.06
83%
23 Construction of Toilets 1 0.00 0.00
99%
24 Construction of Well 1 0.06 0.00
0%
25 Repair & maint of Percolation Tank 1 0.00 0.00
109%
26 Terracing 1 0.00 0.00
73%
27 Underground Dyke for Ground Water Recharge 1 0.05 0.04
98%
Total 225 2.86 2.55