Works completed
395
Sanctioned (pure scheme)
₹7.30 Cr
Expenditure since inception
₹5.60 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
13 works
₹2.44 Cr sanctioned
₹2.34 Cr spent (96%)
02
Construction of Well
58 works
₹88.02 L sanctioned
₹69.65 L spent (79%)
03
Plantation
19 works
₹81.88 L sanctioned
₹17.94 L spent (22%)
04
Construction of Trench
12 works
₹70.49 L sanctioned
₹74.28 L spent (105%)
05
Underground Dyke for Ground Water Recharge
1 works
₹47.72 L sanctioned
₹29.08 L spent (61%)
06
Rural Housing
227 works
₹47.26 L sanctioned
₹32.76 L spent (69%)
07
Construction of Road and Culvert
5 works
₹45.22 L sanctioned
₹14.71 L spent (33%)
08
Construction of Percolation Tank
7 works
₹22.69 L sanctioned
₹21.47 L spent (95%)
09
Solid and Liquid Waste Management
9 works
₹20.24 L sanctioned
₹15.46 L spent (76%)
10
Terracing
3 works
₹12.48 L sanctioned
₹12.08 L spent (97%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 227 0.47 0.33
69%
2 Construction of Well 58 0.88 0.70
79%
3 Plantation 19 0.82 0.18
22%
4 Construction of Check Dam/Stop Dam 13 2.44 2.34
96%
5 Construction of Trench 12 0.70 0.74
105%
6 Farm Pond 11 0.09 0.09
95%
7 Solid and Liquid Waste Management 9 0.20 0.15
76%
8 Construction of Percolation Tank 7 0.23 0.21
95%
9 Roof Water Harvesting on gov/panchayat bldg 6 0.01 0.01
136%
10 Construction of Road and Culvert 5 0.45 0.15
33%
11 Boulder Check/Gully Plug 4 0.06 0.03
50%
12 Construction of Bund 4 0.06 0.05
73%
13 Constr of Cement Concrete Roads 4 0.06 0.02
45%
14 Terracing 3 0.12 0.12
97%
15 Construction of Crematorium 2 0.04 0.04
107%
16 Repair & maint of Percolation Tank 2 0.06 0.04
71%
17 Land Development 2 0.01 0.01
89%
18 Construction of Tank 1 0.04 0.04
94%
19 Constr of Compound wall 1 0.02 0.02
88%
20 Constr of Kitchen Shed 1 0.01 0.01
153%
21 Construction of NADEP/Vermi Compost Pit 1 0.00 0.00
27%
22 Construction of Play field 1 0.02 0.00
2%
23 Repair & maint of Pond/ Tank 1 0.03 0.03
99%
24 Underground Dyke for Ground Water Recharge 1 0.48 0.29
61%
Total 395 7.30 5.60