MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
365
Sanctioned (pure scheme)
₹4.48 Cr
Expenditure since inception
₹3.32 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
51 works
₹1.21 Cr sanctioned
₹31.13 L spent (26%)
02
Construction of Check Dam/Stop Dam
8 works
₹1.10 Cr sanctioned
₹1.01 Cr spent (91%)
03
Construction of Trench
26 works
₹36.62 L sanctioned
₹28.67 L spent (78%)
04
Construction of Well
25 works
₹33.12 L sanctioned
₹30.92 L spent (93%)
05
Rural Housing
175 works
₹33.03 L sanctioned
₹32.24 L spent (98%)
06
Farm Pond
13 works
₹18.20 L sanctioned
₹18.14 L spent (100%)
07
Construction of Road and Culvert
7 works
₹15.03 L sanctioned
₹15.18 L spent (101%)
08
Construction of Recharge Pits
4 works
₹10.31 L sanctioned
₹9.93 L spent (96%)
09
Well Recharge
2 works
₹10.09 L sanctioned
₹8.00 L spent (79%)
10
Construction of Percolation Tank
2 works
₹10.04 L sanctioned
₹9.52 L spent (95%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 175 0.33 0.32
98%
2 Plantation 51 1.21 0.31
26%
3 Construction of Trench 26 0.37 0.29
78%
4 Construction of Well 25 0.33 0.31
93%
5 Farm Pond 13 0.18 0.18
100%
6 Bio-Fertilizer 9 0.01 0.01
93%
7 Construction of Check Dam/Stop Dam 8 1.10 1.01
91%
8 Constr of Cement Concrete Roads 7 0.07 0.07
103%
9 Construction of Road and Culvert 7 0.15 0.15
101%
10 Construction of Tank 5 0.07 0.05
73%
11 Cattle Shed 5 0.03 0.03
80%
12 Repair & maint of Pond/ Tank 4 0.04 0.02
57%
13 Construction of Recharge Pits 4 0.10 0.10
96%
14 Construction of Bund 3 0.08 0.07
93%
15 Constr of Kitchen Shed 3 0.01 0.01
68%
16 Roof Water Harvesting on gov/panchayat bldg 3 0.00 0.00
58%
17 Construction of Toilets 3 0.05 0.05
102%
18 Construction of Percolation Tank 2 0.10 0.10
95%
19 Construction of Crematorium 2 0.04 0.04
102%
20 Renovation of traditional water bodies 2 0.00 0.03
0%
21 Terracing 2 0.04 0.05
107%
22 Well Recharge 2 0.10 0.08
79%
23 Boulder Check/Gully Plug 1 0.00 0.01
412%
24 Construction of Fish Drying Infrastructure 1 0.01 0.00
76%
25 Land Development 1 0.03 0.02
69%
26 Constr of Aganwadi 1 0.02 0.02
85%
Total 365 4.48 3.32
All 26 rows (zero-value rows hidden) ⇩ Export to Excel