Works completed
863
Sanctioned (pure scheme)
₹7.87 Cr
Expenditure since inception
₹5.72 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
26 works
₹1.36 Cr sanctioned
₹96.95 L spent (71%)
02
Construction of Well
152 works
₹1.13 Cr sanctioned
₹95.15 L spent (84%)
03
Plantation
30 works
₹1.12 Cr sanctioned
₹20.63 L spent (18%)
04
Construction of Check Dam/Stop Dam
31 works
₹99.04 L sanctioned
₹74.93 L spent (76%)
05
Construction of Trench
19 works
₹96.54 L sanctioned
₹88.10 L spent (91%)
06
Rural Housing
432 works
₹78.99 L sanctioned
₹72.42 L spent (92%)
07
Construction of Bund
43 works
₹28.91 L sanctioned
₹25.38 L spent (88%)
08
Land Development
64 works
₹27.38 L sanctioned
₹20.15 L spent (74%)
09
Farm Pond
24 works
₹25.63 L sanctioned
₹28.11 L spent (110%)
10
Construction of Tank
3 works
₹11.90 L sanctioned
₹10.49 L spent (88%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 432 0.79 0.72
92%
2 Construction of Well 152 1.13 0.95
84%
3 Land Development 64 0.27 0.20
74%
4 Construction of Bund 43 0.29 0.25
88%
5 Construction of Check Dam/Stop Dam 31 0.99 0.75
76%
6 Plantation 30 1.12 0.21
19%
7 Construction of Road and Culvert 26 1.36 0.97
71%
8 Farm Pond 24 0.26 0.28
110%
9 Construction of Trench 19 0.97 0.88
91%
10 Repair & maint of Pond/ Tank 9 0.06 0.05
80%
11 Constr of Cement Concrete Roads 6 0.06 0.05
89%
12 Construction of Crematorium 4 0.07 0.05
74%
13 Boulder Check/Gully Plug 4 0.01 0.01
85%
14 Repair & maint of Water Harvesting Structures 4 0.05 0.05
92%
15 Construction of Tank 3 0.12 0.10
88%
16 Construction of NADEP/Vermi Compost Pit 3 0.00 0.00
34%
17 Underground Dyke for Ground Water Recharge 1 0.02 0.01
78%
18 Community Sanitary Complex 1 0.00 0.00
71%
19 Constr of Aganwadi 1 0.02 0.02
103%
20 Constr of Gabion 1 0.02 0.01
61%
21 Construction of Percolation Tank 1 0.10 0.00
1%
22 Construction of Toilets 1 0.01 0.01
97%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.00 0.00
88%
24 Repair & maint of Road 1 0.08 0.08
100%
25 Terracing 1 0.07 0.05
69%
Total 863 7.87 5.72
All 25 rows (zero-value rows hidden) ⇩ Export to Excel