| Sr. | New Work Type | Completed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|
| 1 | Rural Housing | 165 | 0.28 | 0.26 | 92% |
| 2 | Construction of Check Dam/Stop Dam | 42 | 1.19 | 1.05 | 89% |
| 3 | Construction of Well | 33 | 0.40 | 0.37 | 93% |
| 4 | Constr of Cement Concrete Roads | 16 | 0.16 | 0.15 | 95% |
| 5 | Farm Pond | 14 | 0.45 | 0.44 | 96% |
| 6 | Construction of Trench | 10 | 0.42 | 0.34 | 81% |
| 7 | Cattle Shed | 10 | 0.07 | 0.06 | 79% |
| 8 | Plantation | 8 | 0.40 | 0.20 | 51% |
| 9 | Construction of Road and Culvert | 7 | 0.35 | 0.27 | 75% |
| 10 | Construction of Tank | 7 | 0.35 | 0.32 | 93% |
| 11 | Boulder Check/Gully Plug | 5 | 0.01 | 0.00 | 63% |
| 12 | Land Development | 4 | 0.01 | 0.01 | 67% |
| 13 | Repair & Maint of Check Dam/Stop Dam | 3 | 0.10 | 0.10 | 100% |
| 14 | Constr of Gabion | 3 | 0.12 | 0.13 | 107% |
| 15 | Repair & maint of Pond/ Tank | 3 | 0.04 | 0.04 | 84% |
| 16 | Works for Flood Control and Protection | 2 | 0.12 | 0.12 | 98% |
| 17 | Repair & maint of Water Harvesting Structures | 1 | 0.05 | 0.05 | 87% |
| 18 | Terracing | 1 | 0.02 | 0.02 | 87% |
| 19 | Well Recharge | 1 | 0.06 | 0.04 | 75% |
| 20 | Repair & maint of Road | 1 | 0.00 | 0.00 | 64% |
| Total | 336 | 4.62 | 3.96 |