MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-10-16 08:36:19.743515
to
to
Reset filters
Scope
Works completed
255
Sanctioned (pure scheme)
₹2.61 Cr
Expenditure since inception
₹1.80 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
26 works
₹71.59 L sanctioned
₹52.18 L spent (73%)
02
Constr of Cement Concrete Roads
46 works
₹51.16 L sanctioned
₹32.98 L spent (64%)
03
Construction of Road and Culvert
4 works
₹29.92 L sanctioned
₹15.27 L spent (51%)
04
Repair & maint of Pond/ Tank
4 works
₹18.81 L sanctioned
₹17.86 L spent (95%)
05
Construction of Check Dam/Stop Dam
7 works
₹18.09 L sanctioned
₹15.57 L spent (86%)
06
Farm Pond
5 works
₹14.19 L sanctioned
₹7.65 L spent (54%)
07
Rural Housing
76 works
₹12.77 L sanctioned
₹11.85 L spent (93%)
08
Construction of Percolation Tank
1 works
₹9.07 L sanctioned
₹4.59 L spent (51%)
09
Construction of Toilets
49 works
₹5.88 L sanctioned
₹5.35 L spent (91%)
10
Construction of Trench
4 works
₹5.41 L sanctioned
₹2.97 L spent (55%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 76 12.77 11.85
93%
2 Construction of Toilets 49 5.88 5.35
91%
3 Constr of Cement Concrete Roads 46 51.16 32.98
65%
4 Construction of Well 26 71.59 52.18
73%
5 Goat Shelter 8 3.76 2.80
74%
6 Well Recharge 7 1.81 1.07
59%
7 Construction of Check Dam/Stop Dam 7 18.09 15.57
86%
8 Solid and Liquid Waste Management 5 4.28 4.15
97%
9 Farm Pond 5 14.19 7.65
54%
10 Construction of Road and Culvert 4 29.92 15.27
51%
11 Repair & maint of Pond/ Tank 4 18.81 17.86
95%
12 Construction of Recharge Pits 4 0.57 0.39
68%
13 Construction of Trench 4 5.41 2.97
55%
14 Roof Water Harvesting on gov/panchayat bldg 2 0.32 0.21
65%
15 Plantation 2 2.26 0.81
36%
16 Constr of Gabion 1 0.91 0.49
54%
17 Construction of Percolation Tank 1 9.07 4.59
51%
18 Construction of NADEP/Vermi Compost Pit 1 0.30 0.29
97%
19 Construction of Crematorium 1 2.45 2.30
94%
20 Renovation of traditional water bodies 1 3.03 0.68
22%
21 Construction of Play field 1 4.47 1.03
23%
Total 255 261.05 180.49
All 21 rows (zero-value rows hidden) ⇩ Export to Excel