Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
107
Sanctioned (pure scheme)
₹91.16 L
Expenditure since inception
₹41.23 L

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
8 works
₹30.84 L sanctioned
₹2.78 L spent (9%)
02
Constr of Cement Concrete Roads
22 works
₹9.80 L sanctioned
₹9.70 L spent (99%)
03
Constr of Compound wall
3 works
₹7.92 L sanctioned
₹5.40 L spent (68%)
04
Constr of GP Bhawan
1 works
₹5.22 L sanctioned
₹4.06 L spent (78%)
05
Construction of Check Dam/Stop Dam
3 works
₹4.80 L sanctioned
₹75,932 spent (16%)
06
Construction of Road and Culvert
1 works
₹4.73 L sanctioned
₹1,273 spent (0%)
07
Solid and Liquid Waste Management
10 works
₹4.22 L sanctioned
₹3.59 L spent (85%)
08
Rural Housing
21 works
₹3.89 L sanctioned
₹3.79 L spent (97%)
09
Construction of Crematorium
2 works
₹3.60 L sanctioned
₹3.53 L spent (98%)
10
Cattle Shed
3 works
₹2.64 L sanctioned
₹2.38 L spent (90%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Constr of Cement Concrete Roads 22 9.80 9.70
99%
2 Rural Housing 21 3.89 3.79
97%
3 Construction of Toilets 12 0.38 0.31
80%
4 Solid and Liquid Waste Management 10 4.22 3.59
85%
5 Plantation 8 30.84 2.78
9%
6 Cattle Shed 3 2.64 2.38
90%
7 Construction of Check Dam/Stop Dam 3 4.80 0.76
16%
8 Land Development 3 0.77 0.01
2%
9 Constr of Compound wall 3 7.92 5.40
68%
10 Construction of Recharge Pits 3 0.41 0.20
49%
11 Construction of Bund 3 2.01 0.80
40%
12 Construction of Crematorium 2 3.60 3.53
98%
13 Construction of Trench 2 1.84 0.79
43%
14 Terracing 2 1.07 0.70
65%
15 Works for Flood Control and Protection 1 2.08 0.65
31%
16 Community Sanitary Complex 1 0.73 0.42
57%
17 Constr of GP Bhawan 1 5.22 4.06
78%
18 Construction of NADEP/Vermi Compost Pit 1 0.06 0.05
77%
19 Construction of Play field 1 0.79 0.57
72%
20 Construction of Road and Culvert 1 4.73 0.01
0%
21 Construction of Tank 1 2.15 0.03
2%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.40 0.32
80%
23 Farm Pond 1 0.56 0.23
42%
24 Well Recharge 1 0.26 0.15
56%
Total 107 91.16 41.23