Works completed
177
Sanctioned (pure scheme)
₹94.66 L
Expenditure since inception
₹52.78 L

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
9 works
₹27.01 L sanctioned
₹7.93 L spent (29%)
02
Construction of Road and Culvert
1 works
₹14.19 L sanctioned
₹1.35 L spent (10%)
03
Rural Housing
75 works
₹13.65 L sanctioned
₹13.39 L spent (98%)
04
Constr of Cement Concrete Roads
30 works
₹11.21 L sanctioned
₹10.00 L spent (89%)
05
Land Development
10 works
₹6.49 L sanctioned
₹5.44 L spent (84%)
06
Construction of Trench
1 works
₹4.54 L sanctioned
₹1.17 L spent (26%)
07
Cattle Shed
2 works
₹2.46 L sanctioned
₹2.46 L spent (100%)
08
Works for Flood Control and Protection
5 works
₹2.42 L sanctioned
₹2.02 L spent (83%)
09
Constr of Gabion
1 works
₹2.10 L sanctioned
₹62,276 spent (30%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹1.74 L sanctioned
₹1.43 L spent (82%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 75 13.65 13.39
98%
2 Constr of Cement Concrete Roads 30 11.21 10.00
89%
3 Construction of Toilets 12 1.44 1.43
99%
4 Land Development 10 6.49 5.44
84%
5 Plantation 9 27.01 7.93
29%
6 Construction of NADEP/Vermi Compost Pit 8 1.39 1.12
81%
7 Works for Flood Control and Protection 5 2.42 2.02
83%
8 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 1.74 1.43
82%
9 Constr of Compound wall 4 1.28 1.29
101%
10 Construction of Recharge Pits 3 0.34 0.18
53%
11 Repair & Maint of Community infrastructure 3 0.20 0.20
98%
12 Cattle Shed 2 2.46 2.46
100%
13 Roof Water Harvesting on gov/panchayat bldg 2 0.63 0.57
91%
14 Solid and Liquid Waste Management 2 0.22 0.22
98%
15 Constr of GP Bhawan 1 1.20 1.19
99%
16 Construction of Road and Culvert 1 14.19 1.35
10%
17 Constr of Gabion 1 2.10 0.62
30%
18 Construction of Trench 1 4.54 1.17
26%
19 Construction of Well 1 1.21 0.16
13%
20 Repaire and Maint of NADEP/Vermi Compost Pit 1 0.22 0.19
87%
21 Community Sanitary Complex 1 0.73 0.44
60%
Total 177 94.66 52.78