Scope
Works completed
807
Sanctioned (pure scheme)
₹5.20 Cr
Expenditure since inception
₹3.40 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
26 works
₹96.80 L sanctioned
₹31.47 L spent (33%)
02
Cattle Shed
38 works
₹77.44 L sanctioned
₹37.46 L spent (48%)
03
Rural Housing
405 works
₹65.86 L sanctioned
₹65.35 L spent (99%)
04
Construction of Bund
53 works
₹43.93 L sanctioned
₹30.86 L spent (70%)
05
Construction of Road and Culvert
4 works
₹36.13 L sanctioned
₹21.39 L spent (59%)
06
Farm Pond
6 works
₹22.94 L sanctioned
₹13.50 L spent (59%)
07
Land Development
26 works
₹22.32 L sanctioned
₹14.06 L spent (63%)
08
Construction of Check Dam/Stop Dam
5 works
₹19.63 L sanctioned
₹19.04 L spent (97%)
09
Constr of Cement Concrete Roads
28 works
₹17.42 L sanctioned
₹16.06 L spent (92%)
10
Repair & maint of Pond/ Tank
3 works
₹17.09 L sanctioned
₹7.47 L spent (44%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 405 65.86 65.35
99%
2 Construction of Toilets 130 14.04 13.55
97%
3 Construction of Bund 53 43.93 30.86
70%
4 Cattle Shed 38 77.44 37.46
48%
5 Constr of Cement Concrete Roads 28 17.42 16.06
92%
6 Plantation 26 96.80 31.47
33%
7 Land Development 26 22.32 14.06
63%
8 Construction of NADEP/Vermi Compost Pit 22 6.22 4.51
73%
9 Solid and Liquid Waste Management 16 2.82 2.57
91%
10 Boulder Check/Gully Plug 9 3.59 1.21
34%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 8 9.78 6.24
64%
12 Farm Pond 6 22.94 13.50
59%
13 Construction of Check Dam/Stop Dam 5 19.63 19.04
97%
14 Construction of Crematorium 5 10.83 10.07
93%
15 Renovation of Canal 4 4.33 3.81
88%
16 Construction of Road and Culvert 4 36.13 21.39
59%
17 Repair & maint of Pond/ Tank 3 17.09 7.47
44%
18 Culvert 3 8.32 8.03
97%
19 Repair & maint of Road 2 16.84 16.71
99%
20 Terracing 2 1.96 0.72
37%
21 Repaire and Maint of NADEP/Vermi Compost Pit 2 0.79 0.69
88%
22 Renovation of traditional water bodies 2 2.45 0.76
31%
23 Works for Flood Control and Protection 1 3.81 3.04
80%
24 Community Sanitary Complex 1 0.45 0.44
99%
25 Constr of Compound wall 1 1.06 1.04
98%
26 Constr of Gabion 1 6.22 6.02
97%
27 Construction of Tank 1 3.66 3.15
86%
28 Construction of Trench 1 0.93 0.02
2%
29 Construction of Well 1 2.10 0.00
0%
30 Well Recharge 1 0.53 0.45
86%
Total 807 520.28 339.71
All 30 rows (zero-value rows hidden) ⇩ Export to Excel