MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
499
Sanctioned (pure scheme)
₹3.13 Cr
Expenditure since inception
₹1.61 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
51 works
₹78.56 L sanctioned
₹41.10 L spent (52%)
02
Land Development
26 works
₹68.33 L sanctioned
₹8.57 L spent (13%)
03
Construction of Road and Culvert
4 works
₹36.14 L sanctioned
₹20.90 L spent (58%)
04
Rural Housing
173 works
₹30.37 L sanctioned
₹29.89 L spent (98%)
05
Constr of Cement Concrete Roads
31 works
₹24.64 L sanctioned
₹15.84 L spent (64%)
06
Construction of Bund
22 works
₹9.75 L sanctioned
₹4.52 L spent (46%)
07
Well Recharge
50 works
₹7.79 L sanctioned
₹5.25 L spent (67%)
08
Farm Pond
3 works
₹7.14 L sanctioned
₹3.15 L spent (44%)
09
Construction of Check Dam/Stop Dam
6 works
₹5.95 L sanctioned
₹2.34 L spent (39%)
10
Repair & maint of Pond/ Tank
1 works
₹4.18 L sanctioned
₹1.27 L spent (30%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 173 30.37 29.89
98%
2 Construction of Toilets 81 3.97 3.89
98%
3 Plantation 51 78.56 41.10
52%
4 Well Recharge 50 7.79 5.25
68%
5 Constr of Cement Concrete Roads 31 24.64 15.84
64%
6 Land Development 26 68.33 8.57
13%
7 Construction of Bund 22 9.75 4.52
46%
8 Construction of NADEP/Vermi Compost Pit 11 3.25 1.84
57%
9 Repair & Maint of Bund 9 3.60 1.73
48%
10 Construction of Recharge Pits 8 1.26 0.71
57%
11 Construction of Tank 6 2.20 1.57
72%
12 Construction of Check Dam/Stop Dam 6 5.95 2.34
39%
13 Solid and Liquid Waste Management 4 1.12 1.05
94%
14 Construction of Road and Culvert 4 36.14 20.90
58%
15 Farm Pond 3 7.14 3.15
44%
16 Works for Flood Control and Protection 2 2.25 2.24
99%
17 Construction of Well 2 3.32 1.84
55%
18 Repair & Maint of Community infrastructure 2 3.67 3.42
93%
19 Other Works 1 3.40 2.36
69%
20 Construction of Trench 1 1.53 1.44
94%
21 Renovation of traditional water bodies 1 0.00 1.84
0%
22 Construction of Play field 1 3.96 1.09
27%
23 Constr of Compound wall 1 1.30 1.08
83%
24 Repair & maint of Pond/ Tank 1 4.18 1.27
30%
25 Construction of Percolation Tank 1 1.20 0.77
65%
26 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 4.16 1.49
36%
Total 499 313.03 161.21
All 26 rows (zero-value rows hidden) ⇩ Export to Excel