Scope
Works completed
351
Sanctioned (pure scheme)
₹1.90 Cr
Expenditure since inception
₹88.61 L

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
18 works
₹48.09 L sanctioned
₹5.24 L spent (11%)
02
Construction of Road and Culvert
7 works
₹44.53 L sanctioned
₹13.05 L spent (29%)
03
Rural Housing
180 works
₹30.66 L sanctioned
₹30.15 L spent (98%)
04
Land Development
12 works
₹15.62 L sanctioned
₹6.38 L spent (41%)
05
Constr of Cement Concrete Roads
10 works
₹11.90 L sanctioned
₹6.13 L spent (52%)
06
Construction of Bund
26 works
₹8.65 L sanctioned
₹4.54 L spent (52%)
07
Construction of Toilets
47 works
₹5.08 L sanctioned
₹5.05 L spent (99%)
08
Farm Pond
3 works
₹3.57 L sanctioned
₹1.47 L spent (41%)
09
Construction of Well
1 works
₹3.38 L sanctioned
₹1.28 L spent (38%)
10
Construction of Check Dam/Stop Dam
8 works
₹3.33 L sanctioned
₹2.51 L spent (75%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 180 30.66 30.15
98%
2 Construction of Toilets 47 5.08 5.05
99%
3 Construction of Bund 26 8.65 4.54
53%
4 Plantation 18 48.09 5.24
11%
5 Construction of Trench 15 2.86 2.71
95%
6 Land Development 12 15.62 6.38
41%
7 Constr of Cement Concrete Roads 10 11.90 6.13
52%
8 Construction of Check Dam/Stop Dam 8 3.33 2.51
75%
9 Construction of Road and Culvert 7 44.53 13.05
29%
10 Repair & Maint of Canal 6 3.23 2.70
84%
11 Construction of Recharge Pits 5 0.81 0.75
92%
12 Works for Flood Control and Protection 4 1.37 0.87
64%
13 Farm Pond 3 3.57 1.47
41%
14 Construction of NADEP/Vermi Compost Pit 2 0.24 0.06
25%
15 Repair & maint of Pond/ Tank 1 0.97 0.84
87%
16 Constr of Compound wall 1 0.45 0.44
98%
17 Terracing 1 0.83 0.71
85%
18 Constr of Aganwadi 1 1.80 1.71
95%
19 Construction of Canal 1 0.68 0.53
79%
20 Construction of Well 1 3.38 1.28
38%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.11 0.11
99%
22 Deepening / Desilting of Flood Channels 1 1.51 1.40
93%
Total 351 189.68 88.61
All 22 rows (zero-value rows hidden) ⇩ Export to Excel