Works completed
874
Sanctioned (pure scheme)
₹8.38 Cr
Expenditure since inception
₹6.88 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Land Development
150 works
₹1.80 Cr sanctioned
₹1.45 Cr spent (81%)
02
Construction of Check Dam/Stop Dam
41 works
₹1.10 Cr sanctioned
₹89.85 L spent (82%)
03
Farm Pond
161 works
₹97.49 L sanctioned
₹99.92 L spent (102%)
04
Plantation
51 works
₹88.57 L sanctioned
₹32.07 L spent (36%)
05
Rural Housing
322 works
₹55.79 L sanctioned
₹52.87 L spent (95%)
06
Construction of Well
29 works
₹55.09 L sanctioned
₹50.38 L spent (91%)
07
Construction of Trench
15 works
₹47.33 L sanctioned
₹37.58 L spent (79%)
08
Culvert
4 works
₹39.79 L sanctioned
₹38.48 L spent (97%)
09
Construction of Road and Culvert
7 works
₹36.75 L sanctioned
₹30.14 L spent (82%)
10
Construction of Tank
6 works
₹33.74 L sanctioned
₹28.12 L spent (83%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 322 0.56 0.53
95%
2 Farm Pond 161 0.97 1.00
103%
3 Land Development 150 1.80 1.45
81%
4 Plantation 51 0.89 0.32
36%
5 Construction of Check Dam/Stop Dam 41 1.10 0.90
82%
6 Construction of Well 29 0.55 0.50
91%
7 Construction of NADEP/Vermi Compost Pit 22 0.06 0.05
81%
8 Construction of Toilets 20 0.00 0.00
11%
9 Cattle Shed 15 0.15 0.14
89%
10 Construction of Trench 15 0.47 0.38
79%
11 Construction of Bund 12 0.18 0.14
78%
12 Construction of Road and Culvert 7 0.37 0.30
82%
13 Construction of Tank 6 0.34 0.28
83%
14 Constr of Cement Concrete Roads 4 0.17 0.13
78%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.09 0.06
65%
16 Culvert 4 0.40 0.38
97%
17 Renovation of traditional water bodies 3 0.17 0.27
162%
18 Boulder Check/Gully Plug 2 0.00 0.00
90%
19 Goat Shelter 2 0.01 0.00
1%
20 Constr of Aganwadi 1 0.02 0.02
98%
21 Poultry Shelter 1 0.01 0.00
79%
22 Construction of Crematorium 1 0.02 0.02
94%
23 Construction of Play field 1 0.04 0.00
3%
Total 874 8.38 6.88