MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-08 07:29:29.870156
to
to
Reset filters
Scope
Works completed
1,423
Sanctioned (pure scheme)
₹12.58 Cr
Expenditure since inception
₹10.27 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
195 works
₹2.56 Cr sanctioned
₹2.14 Cr spent (84%)
02
Construction of Well
85 works
₹1.75 Cr sanctioned
₹1.46 Cr spent (83%)
03
Farm Pond
251 works
₹1.28 Cr sanctioned
₹1.07 Cr spent (84%)
04
Rural Housing
619 works
₹1.12 Cr sanctioned
₹98.31 L spent (88%)
05
Construction of Road and Culvert
16 works
₹69.26 L sanctioned
₹50.71 L spent (73%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
15 works
₹64.46 L sanctioned
₹52.17 L spent (81%)
07
Construction of Check Dam/Stop Dam
22 works
₹54.63 L sanctioned
₹42.18 L spent (77%)
08
Repair & Maint of Check Dam/Stop Dam
14 works
₹45.39 L sanctioned
₹36.77 L spent (81%)
09
Terracing
46 works
₹44.62 L sanctioned
₹33.67 L spent (75%)
10
Construction of Trench
20 works
₹42.99 L sanctioned
₹35.24 L spent (82%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 619 1.12 0.98
88%
2 Farm Pond 251 1.28 1.07
84%
3 Construction of Bund 195 2.56 2.14
84%
4 Construction of Well 85 1.75 1.46
83%
5 Land Development 51 0.43 0.37
86%
6 Terracing 46 0.45 0.34
76%
7 Construction of Check Dam/Stop Dam 22 0.55 0.42
77%
8 Construction of Trench 20 0.43 0.35
82%
9 Construction of Road and Culvert 16 0.69 0.51
73%
10 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 15 0.64 0.52
81%
11 Repair & Maint of Check Dam/Stop Dam 14 0.45 0.37
81%
12 Plantation 14 0.24 0.12
52%
13 Repair & maint of Water Harvesting Structures 12 0.36 0.29
83%
14 Construction of Percolation Tank 11 0.31 0.23
74%
15 Constr of Cement Concrete Roads 11 0.11 0.08
73%
16 Cattle Shed 10 0.10 0.09
93%
17 Well Recharge 9 0.18 0.13
71%
18 Constr of Gabion 7 0.24 0.19
78%
19 Boulder Check/Gully Plug 6 0.28 0.26
91%
20 Construction of Recharge Pits 4 0.20 0.20
98%
21 Other Works 1 0.03 0.00
10%
22 Renovation of traditional water bodies 1 0.08 0.07
95%
23 Culvert 1 0.04 0.01
24%
24 Constr of Aganwadi 1 0.06 0.05
97%
25 Community Sanitary Complex 1 0.00 0.00
103%
Total 1,423 12.58 10.27
All 25 rows (zero-value rows hidden) ⇩ Export to Excel