Showcase — Completed Works

Rollup last refreshed: 2026-09-21 07:03:55.111558
to
to
Reset filters
Scope
Works completed
889
Sanctioned (pure scheme)
₹11.92 Cr
Expenditure since inception
₹7.76 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
94 works
₹2.40 Cr sanctioned
₹55.86 L spent (23%)
02
Farm Pond
249 works
₹1.85 Cr sanctioned
₹1.74 Cr spent (94%)
03
Construction of Trench
10 works
₹1.74 Cr sanctioned
₹32.84 L spent (19%)
04
Construction of Check Dam/Stop Dam
27 works
₹1.40 Cr sanctioned
₹1.06 Cr spent (76%)
05
Construction of Bund
75 works
₹1.20 Cr sanctioned
₹1.07 Cr spent (89%)
06
Construction of NADEP/Vermi Compost Pit
40 works
₹70.87 L sanctioned
₹67.06 L spent (95%)
07
Rural Housing
289 works
₹53.28 L sanctioned
₹51.02 L spent (96%)
08
Construction of Road and Culvert
9 works
₹42.74 L sanctioned
₹27.08 L spent (63%)
09
Works for Flood Control and Protection
9 works
₹32.71 L sanctioned
₹26.89 L spent (82%)
10
Construction of Well
24 works
₹32.59 L sanctioned
₹31.01 L spent (95%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 289 0.53 0.51
96%
2 Farm Pond 249 1.85 1.74
94%
3 Plantation 94 2.40 0.56
23%
4 Construction of Bund 75 1.20 1.07
90%
5 Construction of NADEP/Vermi Compost Pit 40 0.71 0.67
95%
6 Construction of Check Dam/Stop Dam 27 1.40 1.06
76%
7 Construction of Well 24 0.33 0.31
95%
8 Constr of Cement Concrete Roads 21 0.16 0.15
96%
9 Terracing 13 0.25 0.24
96%
10 Construction of Trench 10 1.74 0.33
19%
11 Construction of Road and Culvert 9 0.43 0.27
63%
12 Works for Flood Control and Protection 9 0.33 0.27
82%
13 Land Development 8 0.18 0.18
100%
14 Deepening / Desilting of Flood Channels 4 0.08 0.11
132%
15 Constr of Gabion 3 0.06 0.04
75%
16 Repair & maint of Pond/ Tank 3 0.14 0.11
78%
17 Well Recharge 3 0.05 0.01
21%
18 Construction of Play field 2 0.05 0.03
65%
19 Construction of Crematorium 2 0.02 0.02
100%
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.03 0.03
88%
21 Constr of Kitchen Shed 1 0.00 0.00
97%
22 Community Sanitary Complex 1 0.00 0.00
87%
23 Renovation of traditional water bodies 1 0.00 0.05
0%
Total 889 11.92 7.76
All 23 rows (zero-value rows hidden) ⇩ Export to Excel