Works completed
401
Sanctioned (pure scheme)
₹3.54 Cr
Expenditure since inception
₹2.43 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
29 works
₹69.39 L sanctioned
₹32.25 L spent (46%)
02
Construction of Check Dam/Stop Dam
7 works
₹63.09 L sanctioned
₹39.87 L spent (63%)
03
Construction of Road and Culvert
5 works
₹40.09 L sanctioned
₹14.91 L spent (37%)
04
Construction of Bund
48 works
₹37.95 L sanctioned
₹31.94 L spent (84%)
05
Rural Housing
177 works
₹31.64 L sanctioned
₹31.17 L spent (99%)
06
Farm Pond
94 works
₹22.31 L sanctioned
₹15.58 L spent (70%)
07
Land Development
4 works
₹14.63 L sanctioned
₹10.57 L spent (72%)
08
Works for Flood Control and Protection
6 works
₹9.45 L sanctioned
₹8.49 L spent (90%)
09
Constr of Cement Concrete Roads
12 works
₹9.07 L sanctioned
₹8.51 L spent (94%)
10
Repair & maint of Pond/ Tank
2 works
₹8.21 L sanctioned
₹7.52 L spent (92%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 177 31.64 31.17
99%
2 Farm Pond 94 22.31 15.58
70%
3 Construction of Bund 48 37.95 31.94
84%
4 Plantation 29 69.39 32.25
47%
5 Constr of Cement Concrete Roads 12 9.07 8.51
94%
6 Construction of Check Dam/Stop Dam 7 63.09 39.87
63%
7 Works for Flood Control and Protection 6 9.45 8.49
90%
8 Construction of Road and Culvert 5 40.09 14.91
37%
9 Land Development 4 14.63 10.57
72%
10 Construction of Trench 2 5.41 4.70
87%
11 Renovation of Canal 2 7.52 6.57
87%
12 Construction of NADEP/Vermi Compost Pit 2 1.05 1.00
96%
13 Repair & maint of Pond/ Tank 2 8.21 7.52
92%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 7.63 5.26
69%
15 Constr of Aganwadi 1 4.15 4.09
99%
16 Constr of Kitchen Shed 1 0.16 0.16
100%
17 Construction of Crematorium 1 1.80 1.80
100%
18 Construction of Percolation Tank 1 1.74 1.47
85%
19 Construction of Tank 1 3.93 3.45
88%
20 Construction of Well 1 2.00 1.99
99%
21 Deepening / Desilting of Flood Channels 1 2.50 1.85
74%
22 Renovation of traditional water bodies 1 7.11 7.07
100%
23 Repair & Maint of Canal 1 2.70 2.34
87%
24 Repair & maint of Road 1 0.57 0.55
96%
Total 401 354.10 243.12