MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-05 08:30:05.836701
to
to
Reset filters
Scope
Works completed
910
Sanctioned (pure scheme)
₹6.37 Cr
Expenditure since inception
₹4.84 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
210 works
₹1.27 Cr sanctioned
₹98.52 L spent (78%)
02
Land Development
96 works
₹1.21 Cr sanctioned
₹97.32 L spent (80%)
03
Construction of Road and Culvert
15 works
₹82.59 L sanctioned
₹52.19 L spent (63%)
04
Construction of Check Dam/Stop Dam
97 works
₹74.62 L sanctioned
₹67.34 L spent (90%)
05
Rural Housing
413 works
₹73.28 L sanctioned
₹70.23 L spent (96%)
06
Constr of Cement Concrete Roads
10 works
₹33.93 L sanctioned
₹13.84 L spent (41%)
07
Plantation
13 works
₹31.16 L sanctioned
₹11.35 L spent (36%)
08
Construction of Tank
3 works
₹14.13 L sanctioned
₹12.07 L spent (85%)
09
Construction of Trench
7 works
₹13.85 L sanctioned
₹13.16 L spent (95%)
10
Lining of Canal
2 works
₹13.71 L sanctioned
₹12.53 L spent (91%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 413 0.73 0.70
96%
2 Farm Pond 210 1.27 0.99
78%
3 Construction of Check Dam/Stop Dam 97 0.75 0.67
90%
4 Land Development 96 1.21 0.97
80%
5 Construction of Road and Culvert 15 0.83 0.52
63%
6 Construction of Bund 13 0.06 0.05
85%
7 Plantation 13 0.31 0.11
36%
8 Constr of Cement Concrete Roads 10 0.34 0.14
41%
9 Construction of Trench 7 0.14 0.13
95%
10 Construction of Well 5 0.10 0.04
36%
11 Deepening / Desilting of Flood Channels 4 0.10 0.11
118%
12 Boulder Check/Gully Plug 3 0.00 0.00
88%
13 Constr of Gabion 3 0.00 0.00
88%
14 Construction of Crematorium 3 0.05 0.05
100%
15 Construction of Recharge Pits 3 0.01 0.00
55%
16 Construction of Tank 3 0.14 0.12
86%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.02 0.00
9%
18 Lining of Canal 2 0.14 0.13
91%
19 Well Recharge 2 0.07 0.02
32%
20 Works for Flood Control and Protection 2 0.05 0.04
78%
21 Terracing 1 0.01 0.01
89%
22 Constr of Food Grain storage 1 0.04 0.02
45%
23 Construction of Percolation Tank 1 0.00 0.00
89%
24 Construction of Other Community Building/Assets 1 0.00 0.00
0%
Total 910 6.37 4.84
All 24 rows (zero-value rows hidden) ⇩ Export to Excel