MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-09 08:33:24.811433
to
to
Reset filters
Scope
Works completed
644
Sanctioned (pure scheme)
₹7.35 Cr
Expenditure since inception
₹5.80 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
78 works
₹2.88 Cr sanctioned
₹2.28 Cr spent (79%)
02
Farm Pond
203 works
₹1.20 Cr sanctioned
₹91.13 L spent (76%)
03
Construction of Check Dam/Stop Dam
178 works
₹76.17 L sanctioned
₹71.61 L spent (94%)
04
Land Development
51 works
₹66.59 L sanctioned
₹39.26 L spent (59%)
05
Construction of Well
20 works
₹36.73 L sanctioned
₹29.52 L spent (80%)
06
Deepening / Desilting of Flood Channels
1 works
₹34.33 L sanctioned
₹31.79 L spent (93%)
07
Constr of Cement Concrete Roads
16 works
₹33.46 L sanctioned
₹26.65 L spent (80%)
08
Construction of Road and Culvert
3 works
₹21.93 L sanctioned
₹16.12 L spent (74%)
09
Rural Housing
71 works
₹13.00 L sanctioned
₹11.86 L spent (91%)
10
Repair & maint of Pond/ Tank
5 works
₹10.84 L sanctioned
₹8.26 L spent (76%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 203 1.20 0.91
76%
2 Construction of Check Dam/Stop Dam 178 0.76 0.72
94%
3 Plantation 78 2.88 2.28
79%
4 Rural Housing 71 0.13 0.12
91%
5 Land Development 51 0.67 0.39
59%
6 Construction of Well 20 0.37 0.30
80%
7 Constr of Cement Concrete Roads 16 0.33 0.27
80%
8 Construction of Bund 7 0.06 0.03
58%
9 Repair & maint of Pond/ Tank 5 0.11 0.08
76%
10 Construction of Road and Culvert 3 0.22 0.16
74%
11 Construction of Percolation Tank 2 0.00 0.00
65%
12 Works for Flood Control and Protection 2 0.10 0.10
104%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.03 0.03
97%
14 Construction of Crematorium 1 0.02 0.01
82%
15 Construction of NADEP/Vermi Compost Pit 1 0.03 0.03
90%
16 Construction of Trench 1 0.00 0.00
74%
17 Deepening / Desilting of Flood Channels 1 0.34 0.32
93%
18 Other Works 1 0.03 0.03
82%
19 Renovation of traditional water bodies 1 0.04 0.02
45%
20 Well Recharge 1 0.02 0.00
11%
Total 644 7.35 5.80
All 20 rows (zero-value rows hidden) ⇩ Export to Excel