| Sr. | New Work Type | Completed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|
| 1 | Rural Housing | 239 | 0.44 | 0.42 | 96% |
| 2 | Construction of Check Dam/Stop Dam | 174 | 6.03 | 0.86 | 14% |
| 3 | Construction of Trench | 72 | 0.70 | 0.49 | 71% |
| 4 | Construction of Bund | 29 | 0.39 | 0.27 | 70% |
| 5 | Land Development | 27 | 0.19 | 0.16 | 83% |
| 6 | Farm Pond | 26 | 0.67 | 0.50 | 75% |
| 7 | Construction of Well | 22 | 0.54 | 0.40 | 73% |
| 8 | Plantation | 16 | 0.50 | 0.26 | 52% |
| 9 | Works for Flood Control and Protection | 15 | 0.24 | 0.17 | 72% |
| 10 | Constr of Cement Concrete Roads | 10 | 0.10 | 0.07 | 69% |
| 11 | Construction of Road and Culvert | 7 | 0.53 | 0.29 | 55% |
| 12 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 4 | 0.24 | 0.17 | 71% |
| 13 | Strengthening of Embankment | 3 | 0.10 | 0.08 | 78% |
| 14 | Construction of Crematorium | 3 | 0.06 | 0.05 | 88% |
| 15 | Repair & maint of Pond/ Tank | 2 | 0.11 | 0.09 | 86% |
| 16 | Culvert | 2 | 0.09 | 0.05 | 51% |
| 17 | Construction of Percolation Tank | 1 | 0.15 | 0.11 | 73% |
| 18 | Boulder Check/Gully Plug | 1 | 0.04 | 0.01 | 36% |
| 19 | Repair & maint of Water Harvesting Structures | 1 | 0.01 | 0.00 | 88% |
| Total | 654 | 11.12 | 4.46 |