MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
958
Sanctioned (pure scheme)
₹32.28 Cr
Expenditure since inception
₹6.10 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
248 works
₹16.63 Cr sanctioned
₹1.36 Cr spent (8%)
02
Deepening / Desilting of Flood Channels
4 works
₹6.18 Cr sanctioned
₹6.65 L spent (1%)
03
Culvert
2 works
₹3.44 Cr sanctioned
₹15.51 L spent (5%)
04
Construction of Bund
109 works
₹1.05 Cr sanctioned
₹82.61 L spent (78%)
05
Farm Pond
118 works
₹1.04 Cr sanctioned
₹79.12 L spent (76%)
06
Construction of Road and Culvert
15 works
₹75.65 L sanctioned
₹59.29 L spent (78%)
07
Rural Housing
358 works
₹73.22 L sanctioned
₹69.39 L spent (95%)
08
Construction of Well
17 works
₹55.59 L sanctioned
₹39.15 L spent (70%)
09
Construction of Percolation Tank
4 works
₹30.15 L sanctioned
₹22.43 L spent (74%)
10
Construction of Trench
7 works
₹27.13 L sanctioned
₹17.85 L spent (66%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 358 0.73 0.69
95%
2 Construction of Check Dam/Stop Dam 248 16.63 1.36
8%
3 Farm Pond 118 1.04 0.79
76%
4 Construction of Bund 109 1.05 0.83
79%
5 Land Development 28 0.24 0.22
92%
6 Construction of Well 17 0.56 0.39
70%
7 Construction of Road and Culvert 15 0.76 0.59
78%
8 Works for Flood Control and Protection 12 0.18 0.16
85%
9 Construction of Trench 7 0.27 0.18
66%
10 Plantation 6 0.17 0.04
24%
11 Constr of Cement Concrete Roads 5 0.11 0.09
82%
12 Construction of NADEP/Vermi Compost Pit 5 0.01 0.01
96%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.12 0.06
48%
14 Construction of Percolation Tank 4 0.30 0.22
74%
15 Deepening / Desilting of Flood Channels 4 6.18 0.07
1%
16 Repair & maint of Pond/ Tank 3 0.06 0.04
77%
17 Boulder Check/Gully Plug 3 0.06 0.04
72%
18 Constr of Gabion 3 0.10 0.05
52%
19 Construction of Play field 2 0.07 0.05
64%
20 Culvert 2 3.44 0.16
5%
21 Other Works 1 0.01 0.01
97%
22 Well Recharge 1 0.00 0.00
83%
23 Construction of Fish Drying Infrastructure 1 0.03 0.03
82%
24 Strengthening of Embankment 1 0.15 0.03
18%
25 Community Sanitary Complex 1 0.00 0.01
134%
Total 958 32.28 6.10