MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
995
Sanctioned (pure scheme)
₹34.79 Cr
Expenditure since inception
₹6.19 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
273 works
₹25.89 Cr sanctioned
₹1.58 Cr spent (6%)
02
Construction of Road and Culvert
12 works
₹3.00 Cr sanctioned
₹16.16 L spent (5%)
03
Farm Pond
35 works
₹1.29 Cr sanctioned
₹1.03 Cr spent (80%)
04
Construction of Bund
83 works
₹78.32 L sanctioned
₹57.77 L spent (74%)
05
Rural Housing
395 works
₹74.79 L sanctioned
₹72.82 L spent (97%)
06
Construction of Trench
98 works
₹65.40 L sanctioned
₹44.41 L spent (68%)
07
Construction of Well
16 works
₹46.69 L sanctioned
₹33.61 L spent (72%)
08
Plantation
12 works
₹33.42 L sanctioned
₹8.91 L spent (27%)
09
Construction of Fish Drying Infrastructure
6 works
₹29.39 L sanctioned
₹20.24 L spent (69%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹17.86 L sanctioned
₹14.02 L spent (79%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 395 0.75 0.73
97%
2 Construction of Check Dam/Stop Dam 273 25.89 1.58
6%
3 Construction of Trench 98 0.65 0.44
68%
4 Construction of Bund 83 0.78 0.58
74%
5 Farm Pond 35 1.29 1.03
80%
6 Construction of Well 16 0.47 0.34
72%
7 Solid and Liquid Waste Management 13 0.17 0.13
78%
8 Plantation 12 0.33 0.09
27%
9 Construction of Road and Culvert 12 3.00 0.16
5%
10 Construction of NADEP/Vermi Compost Pit 8 0.01 0.01
91%
11 Land Development 8 0.01 0.06
502%
12 Construction of Fish Drying Infrastructure 6 0.29 0.20
69%
13 Constr of Cement Concrete Roads 5 0.06 0.03
61%
14 Works for Flood Control and Protection 4 0.14 0.10
72%
15 Boulder Check/Gully Plug 3 0.13 0.07
59%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 0.18 0.14
79%
17 Repair & maint of Road 3 0.01 0.01
101%
18 Construction of Crematorium 3 0.06 0.05
88%
19 Deepening / Desilting of Flood Channels 2 0.08 0.08
100%
20 Construction of Percolation Tank 2 0.14 0.10
73%
21 Cattle Shed 2 0.02 0.02
76%
22 Terracing 2 0.02 0.01
72%
23 Constr of Gabion 1 0.05 0.03
66%
24 Construction of Play field 1 0.04 0.03
88%
25 Construction of Tank 1 0.14 0.12
88%
26 Other Works 1 0.00 0.00
94%
27 Repair & Maint of Community infrastructure 1 0.03 0.00
2%
28 Repair & maint of Water Harvesting Structures 1 0.05 0.03
59%
29 Community Sanitary Complex 1 0.00 0.00
94%
Total 995 34.79 6.19
All 29 rows (zero-value rows hidden) ⇩ Export to Excel