Works completed
1,039
Sanctioned (pure scheme)
₹40.81 Cr
Expenditure since inception
₹6.21 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
268 works
₹27.37 Cr sanctioned
₹1.11 Cr spent (4%)
02
Well Recharge
4 works
₹3.95 Cr sanctioned
₹3.09 L spent (1%)
03
Construction of Road and Culvert
10 works
₹2.34 Cr sanctioned
₹47.65 L spent (20%)
04
Farm Pond
89 works
₹1.85 Cr sanctioned
₹90.41 L spent (49%)
05
Rural Housing
436 works
₹83.08 L sanctioned
₹76.54 L spent (92%)
06
Construction of Trench
28 works
₹75.00 L sanctioned
₹57.22 L spent (76%)
07
Construction of Well
29 works
₹74.44 L sanctioned
₹60.29 L spent (81%)
08
Construction of Bund
48 works
₹56.98 L sanctioned
₹44.64 L spent (78%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
61 works
₹56.83 L sanctioned
₹36.76 L spent (65%)
10
Plantation
8 works
₹49.89 L sanctioned
₹15.82 L spent (32%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 436 0.83 0.77
92%
2 Construction of Check Dam/Stop Dam 268 27.37 1.11
4%
3 Farm Pond 89 1.85 0.90
49%
4 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 61 0.57 0.37
65%
5 Construction of Bund 48 0.57 0.45
78%
6 Construction of Well 29 0.74 0.60
81%
7 Construction of Trench 28 0.75 0.57
76%
8 Land Development 19 0.22 0.14
65%
9 Constr of Cement Concrete Roads 11 0.22 0.06
29%
10 Construction of Road and Culvert 10 2.34 0.48
20%
11 Works for Flood Control and Protection 9 0.46 0.25
55%
12 Plantation 8 0.50 0.16
32%
13 Well Recharge 4 3.95 0.03
1%
14 Repair & maint of Road 3 0.01 0.01
101%
15 Construction of Crematorium 3 0.06 0.05
94%
16 Construction of Play field 2 0.04 0.01
33%
17 Construction of Percolation Tank 2 0.16 0.13
80%
18 Constr of Gabion 2 0.08 0.03
41%
19 Boulder Check/Gully Plug 2 0.03 0.02
63%
20 Bio-Fertilizer 1 0.00 0.00
93%
21 Cattle Shed 1 0.01 0.00
75%
22 Culvert 1 0.00 0.00
0%
23 Deepening / Desilting of Flood Channels 1 0.04 0.05
112%
24 Other Works 1 0.00 0.00
96%
Total 1,039 40.81 6.21