MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
994
Sanctioned (pure scheme)
₹7.92 Cr
Expenditure since inception
₹6.05 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
190 works
₹2.57 Cr sanctioned
₹2.04 Cr spent (79%)
02
Construction of Check Dam/Stop Dam
253 works
₹1.45 Cr sanctioned
₹1.09 Cr spent (76%)
03
Construction of Bund
70 works
₹87.12 L sanctioned
₹71.21 L spent (82%)
04
Rural Housing
363 works
₹67.78 L sanctioned
₹64.49 L spent (95%)
05
Construction of Well
15 works
₹35.33 L sanctioned
₹27.54 L spent (78%)
06
Construction of Road and Culvert
8 works
₹30.05 L sanctioned
₹19.01 L spent (63%)
07
Construction of Trench
6 works
₹27.76 L sanctioned
₹24.71 L spent (89%)
08
Works for Flood Control and Protection
20 works
₹25.79 L sanctioned
₹19.24 L spent (75%)
09
Constr of Cement Concrete Roads
12 works
₹18.68 L sanctioned
₹6.09 L spent (33%)
10
Plantation
6 works
₹16.41 L sanctioned
₹7.50 L spent (46%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 363 0.68 0.64
95%
2 Construction of Check Dam/Stop Dam 253 1.45 1.09
76%
3 Farm Pond 190 2.57 2.04
79%
4 Construction of Bund 70 0.87 0.71
82%
5 Other Works 21 0.08 0.07
92%
6 Works for Flood Control and Protection 20 0.26 0.19
75%
7 Land Development 15 0.15 0.07
49%
8 Construction of Well 15 0.35 0.28
78%
9 Constr of Cement Concrete Roads 12 0.19 0.06
33%
10 Construction of Road and Culvert 8 0.30 0.19
63%
11 Construction of Trench 6 0.28 0.25
89%
12 Plantation 6 0.16 0.07
46%
13 Deepening / Desilting of Flood Channels 3 0.08 0.06
75%
14 Well Recharge 2 0.01 0.00
77%
15 Construction of Crematorium 2 0.04 0.04
100%
16 Bio-Fertilizer 1 0.00 0.00
96%
17 Boulder Check/Gully Plug 1 0.03 0.02
59%
18 Community Sanitary Complex 1 0.00 0.00
86%
19 Constr of Food Grain storage 1 0.10 0.03
32%
20 Construction of Percolation Tank 1 0.09 0.07
70%
21 Construction of Recharge Pits 1 0.05 0.02
36%
22 Repair & Maint of Community infrastructure 1 0.13 0.09
67%
23 Repair & maint of Water Harvesting Structures 1 0.05 0.04
82%
Total 994 7.92 6.05
All 23 rows (zero-value rows hidden) ⇩ Export to Excel