Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
211 works
₹24.56 Cr sanctioned
₹1.13 Cr spent (5%)
02
Construction of Road and Culvert
11 works
₹11.65 Cr sanctioned
₹44.54 L spent (4%)
03
Construction of Bund
206 works
₹1.84 Cr sanctioned
₹1.59 Cr spent (86%)
04
Farm Pond
56 works
₹1.05 Cr sanctioned
₹80.34 L spent (76%)
05
Rural Housing
485 works
₹92.13 L sanctioned
₹90.43 L spent (98%)
06
Repair & maint of Pond/ Tank
12 works
₹79.03 L sanctioned
₹51.41 L spent (65%)
07
Plantation
20 works
₹71.14 L sanctioned
₹29.86 L spent (42%)
08
Repair & maint of Water Harvesting Structures
2 works
₹39.66 L sanctioned
₹39.11 L spent (99%)
09
Deepening / Desilting of Flood Channels
3 works
₹36.16 L sanctioned
₹9.29 L spent (26%)
10
Constr of Cement Concrete Roads
22 works
₹28.82 L sanctioned
₹23.11 L spent (80%)