MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-01 08:48:19.512575
to
to
Reset filters
Scope
Works completed
625
Sanctioned (pure scheme)
₹28.21 Cr
Expenditure since inception
₹5.33 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
121 works
₹19.25 Cr sanctioned
₹68.46 L spent (4%)
02
Construction of Road and Culvert
8 works
₹3.26 Cr sanctioned
₹36.72 L spent (11%)
03
Construction of Bund
75 works
₹1.49 Cr sanctioned
₹1.15 Cr spent (77%)
04
Farm Pond
55 works
₹89.09 L sanctioned
₹62.08 L spent (70%)
05
Construction of Well
19 works
₹50.55 L sanctioned
₹35.74 L spent (71%)
06
Land Development
37 works
₹48.14 L sanctioned
₹39.48 L spent (82%)
07
Deepening / Desilting of Flood Channels
6 works
₹37.08 L sanctioned
₹13.72 L spent (37%)
08
Rural Housing
192 works
₹36.68 L sanctioned
₹34.11 L spent (93%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
35 works
₹24.84 L sanctioned
₹17.01 L spent (68%)
10
Well Recharge
6 works
₹19.68 L sanctioned
₹14.38 L spent (73%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 192 0.37 0.34
93%
2 Construction of Check Dam/Stop Dam 121 19.25 0.68
4%
3 Construction of Bund 75 1.49 1.15
77%
4 Farm Pond 55 0.89 0.62
70%
5 Land Development 37 0.48 0.39
82%
6 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 35 0.25 0.17
69%
7 Construction of Well 19 0.51 0.36
71%
8 Construction of NADEP/Vermi Compost Pit 16 0.19 0.15
77%
9 Construction of Toilets 15 0.04 0.02
42%
10 Construction of Trench 13 0.14 0.22
149%
11 Plantation 9 0.17 0.07
44%
12 Construction of Road and Culvert 8 3.26 0.37
11%
13 Well Recharge 6 0.20 0.14
73%
14 Deepening / Desilting of Flood Channels 6 0.37 0.14
37%
15 Constr of Cement Concrete Roads 5 0.05 0.04
82%
16 Cattle Shed 3 0.02 0.02
86%
17 Works for Flood Control and Protection 2 0.02 0.00
11%
18 Construction of Percolation Tank 2 0.20 0.16
83%
19 Repair & maint of Pond/ Tank 2 0.09 0.09
97%
20 Construction of Play field 1 0.02 0.02
73%
21 Other Works 1 0.00 0.00
91%
22 Renovation of traditional water bodies 1 0.10 0.07
76%
23 Construction of Tank 1 0.12 0.10
89%
Total 625 28.21 5.33