MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
951
Sanctioned (pure scheme)
₹41.15 Cr
Expenditure since inception
₹7.31 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
149 works
₹32.32 Cr sanctioned
₹1.04 Cr spent (3%)
02
Farm Pond
145 works
₹2.76 Cr sanctioned
₹2.24 Cr spent (81%)
03
Construction of Bund
98 works
₹1.65 Cr sanctioned
₹67.65 L spent (41%)
04
Rural Housing
398 works
₹73.47 L sanctioned
₹64.80 L spent (88%)
05
Construction of Well
16 works
₹48.95 L sanctioned
₹37.67 L spent (77%)
06
Construction of Trench
13 works
₹42.71 L sanctioned
₹23.18 L spent (54%)
07
Other Works
7 works
₹40.99 L sanctioned
₹37.00 L spent (90%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
65 works
₹40.78 L sanctioned
₹34.50 L spent (85%)
09
Construction of Road and Culvert
3 works
₹40.24 L sanctioned
₹27.90 L spent (69%)
10
Plantation
16 works
₹26.89 L sanctioned
₹12.36 L spent (46%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 398 0.73 0.65
88%
2 Construction of Check Dam/Stop Dam 149 32.32 1.04
3%
3 Farm Pond 145 2.76 2.24
81%
4 Construction of Bund 98 1.65 0.68
41%
5 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 65 0.41 0.34
85%
6 Plantation 16 0.27 0.12
46%
7 Construction of Well 16 0.49 0.38
77%
8 Solid and Liquid Waste Management 14 0.26 0.20
79%
9 Construction of Trench 13 0.43 0.23
54%
10 Land Development 9 0.07 0.06
88%
11 Other Works 7 0.41 0.37
90%
12 Constr of Cement Concrete Roads 4 0.14 0.16
116%
13 Well Recharge 3 0.10 0.08
75%
14 Construction of Road and Culvert 3 0.40 0.28
69%
15 Construction of Tank 2 0.15 0.11
69%
16 Construction of Percolation Tank 1 0.10 0.08
84%
17 Lining of Canal 1 0.22 0.10
46%
18 Works for Flood Control and Protection 1 0.03 0.02
51%
19 Construction of Play field 1 0.04 0.02
71%
20 Goat Shelter 1 0.00 0.00
96%
21 Construction of Fish Drying Infrastructure 1 0.03 0.02
90%
22 Repair & maint of Pond/ Tank 1 0.06 0.05
85%
23 Construction of Crematorium 1 0.02 0.02
84%
24 Terracing 1 0.05 0.04
85%
Total 951 41.15 7.31
All 24 rows (zero-value rows hidden) ⇩ Export to Excel