MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
928
Sanctioned (pure scheme)
₹39.71 Cr
Expenditure since inception
₹7.49 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
182 works
₹26.48 Cr sanctioned
₹1.19 Cr spent (5%)
02
Construction of Road and Culvert
8 works
₹6.20 Cr sanctioned
₹60.47 L spent (10%)
03
Construction of Bund
207 works
₹2.37 Cr sanctioned
₹2.04 Cr spent (86%)
04
Farm Pond
85 works
₹1.55 Cr sanctioned
₹1.22 Cr spent (79%)
05
Rural Housing
306 works
₹55.37 L sanctioned
₹53.77 L spent (97%)
06
Construction of Well
22 works
₹48.66 L sanctioned
₹38.13 L spent (78%)
07
Construction of Trench
6 works
₹31.85 L sanctioned
₹20.57 L spent (65%)
08
Land Development
8 works
₹30.44 L sanctioned
₹27.08 L spent (89%)
09
Repair & maint of Water Harvesting Structures
6 works
₹28.07 L sanctioned
₹24.36 L spent (87%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
41 works
₹26.05 L sanctioned
₹19.44 L spent (75%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 306 0.55 0.54
97%
2 Construction of Bund 207 2.37 2.04
86%
3 Construction of Check Dam/Stop Dam 182 26.48 1.19
5%
4 Farm Pond 85 1.55 1.22
79%
5 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 41 0.26 0.19
75%
6 Construction of Well 22 0.49 0.38
78%
7 Solid and Liquid Waste Management 19 0.22 0.18
79%
8 Plantation 11 0.16 0.06
38%
9 Construction of Road and Culvert 8 6.20 0.60
10%
10 Land Development 8 0.30 0.27
89%
11 Constr of Cement Concrete Roads 7 0.04 0.03
74%
12 Repair & maint of Water Harvesting Structures 6 0.28 0.24
87%
13 Construction of Trench 6 0.32 0.21
65%
14 Construction of Village Haats 5 0.01 0.01
99%
15 Works for Flood Control and Protection 4 0.16 0.09
58%
16 Other Works 3 0.15 0.13
88%
17 Well Recharge 2 0.08 0.06
72%
18 Construction of Recharge Pits 2 0.01 0.00
59%
19 Construction of Crematorium 2 0.04 0.03
80%
20 Construction of Play field 1 0.04 0.02
49%
21 Constr of Compound wall 1 0.01 0.00
12%
Total 928 39.71 7.49
All 21 rows (zero-value rows hidden) ⇩ Export to Excel