MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
693
Sanctioned (pure scheme)
₹60.00 Cr
Expenditure since inception
₹5.71 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
152 works
₹36.86 Cr sanctioned
₹78.77 L spent (2%)
02
Deepening / Desilting of Flood Channels
5 works
₹8.98 Cr sanctioned
₹10.57 L spent (1%)
03
Construction of Road and Culvert
8 works
₹8.67 Cr sanctioned
₹40.17 L spent (5%)
04
Farm Pond
100 works
₹1.45 Cr sanctioned
₹1.16 Cr spent (80%)
05
Construction of Bund
145 works
₹1.45 Cr sanctioned
₹1.27 Cr spent (87%)
06
Solid and Liquid Waste Management
23 works
₹45.69 L sanctioned
₹35.38 L spent (77%)
07
Rural Housing
140 works
₹28.66 L sanctioned
₹26.57 L spent (93%)
08
Construction of Well
13 works
₹25.25 L sanctioned
₹17.96 L spent (71%)
09
Well Recharge
10 works
₹24.49 L sanctioned
₹18.46 L spent (75%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
46 works
₹21.77 L sanctioned
₹18.93 L spent (87%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Check Dam/Stop Dam 152 36.86 0.79
2%
2 Construction of Bund 145 1.45 1.27
87%
3 Rural Housing 140 0.29 0.27
93%
4 Farm Pond 100 1.45 1.16
80%
5 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 46 0.22 0.19
87%
6 Solid and Liquid Waste Management 23 0.46 0.35
77%
7 Plantation 14 0.20 0.06
30%
8 Construction of Well 13 0.25 0.18
71%
9 Well Recharge 10 0.24 0.18
75%
10 Land Development 8 0.14 0.13
92%
11 Construction of Road and Culvert 8 8.67 0.40
5%
12 Works for Flood Control and Protection 6 0.20 0.17
87%
13 Constr of Cement Concrete Roads 5 0.07 0.04
57%
14 Deepening / Desilting of Flood Channels 5 8.98 0.11
1%
15 Construction of Trench 4 0.13 0.12
89%
16 Construction of Village Haats 3 0.00 0.00
96%
17 Construction of Crematorium 2 0.04 0.04
100%
18 Terracing 2 0.10 0.08
79%
19 Construction of Play field 1 0.04 0.02
46%
20 Construction of Toilets 1 0.01 0.00
47%
21 Construction of Tank 1 0.06 0.05
84%
22 Nursery Development 1 0.03 0.02
64%
23 Repair & maint of Water Harvesting Structures 1 0.05 0.04
86%
24 Constr of Gabion 1 0.03 0.02
57%
25 Constr of Food Grain storage 1 0.02 0.02
100%
Total 693 60.00 5.71