Works completed
581
Sanctioned (pure scheme)
₹5.55 Cr
Expenditure since inception
₹5.05 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
74 works
₹1.06 Cr sanctioned
₹85.50 L spent (80%)
02
Construction of Well
58 works
₹91.63 L sanctioned
₹1.03 Cr spent (112%)
03
Construction of Trench
6 works
₹65.73 L sanctioned
₹48.26 L spent (73%)
04
Farm Pond
56 works
₹55.53 L sanctioned
₹35.39 L spent (64%)
05
Construction of Road and Culvert
10 works
₹52.73 L sanctioned
₹63.05 L spent (120%)
06
Rural Housing
227 works
₹48.56 L sanctioned
₹45.51 L spent (94%)
07
Construction of Bund
45 works
₹41.87 L sanctioned
₹36.39 L spent (87%)
08
Constr of Cement Concrete Roads
9 works
₹35.47 L sanctioned
₹32.36 L spent (91%)
09
Plantation
14 works
₹18.04 L sanctioned
₹4.34 L spent (24%)
10
Land Development
58 works
₹14.14 L sanctioned
₹23.95 L spent (169%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 227 0.49 0.46
94%
2 Construction of Check Dam/Stop Dam 74 1.06 0.85
81%
3 Construction of Well 58 0.92 1.03
112%
4 Land Development 58 0.14 0.24
169%
5 Farm Pond 56 0.56 0.35
64%
6 Construction of Bund 45 0.42 0.36
87%
7 Plantation 14 0.18 0.04
24%
8 Construction of Road and Culvert 10 0.53 0.63
120%
9 Constr of Cement Concrete Roads 9 0.35 0.32
91%
10 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 6 0.11 0.10
91%
11 Construction of Trench 6 0.66 0.48
73%
12 Well Recharge 5 0.01 0.01
59%
13 Construction of Percolation Tank 3 0.06 0.02
39%
14 Constr of Kitchen Shed 2 0.00 0.00
82%
15 Constr of Aganwadi 2 0.01 0.01
77%
16 Boulder Check/Gully Plug 1 0.00 0.00
86%
17 Constr of Compound wall 1 0.00 0.00
95%
18 Renovation of traditional water bodies 1 0.02 0.02
101%
19 Cattle Shed 1 0.01 0.01
98%
20 Underground Dyke for Ground Water Recharge 1 0.00 0.09
0%
21 Construction of Toilets 1 0.01 0.00
9%
Total 581 5.55 5.05