MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-22 07:03:31.113676
to
to
Reset filters
Scope
Works completed
424
Sanctioned (pure scheme)
₹3.41 Cr
Expenditure since inception
₹2.74 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
8 works
₹1.11 Cr sanctioned
₹88.00 L spent (79%)
02
Construction of Road and Culvert
6 works
₹38.49 L sanctioned
₹32.45 L spent (84%)
03
Rural Housing
175 works
₹31.87 L sanctioned
₹31.52 L spent (99%)
04
Construction of Tank
2 works
₹30.83 L sanctioned
₹29.70 L spent (96%)
05
Plantation
123 works
₹21.93 L sanctioned
₹6.12 L spent (28%)
06
Construction of Trench
5 works
₹19.90 L sanctioned
₹16.94 L spent (85%)
07
Repair & maint of Water Harvesting Structures
5 works
₹12.57 L sanctioned
₹11.29 L spent (90%)
08
Farm Pond
13 works
₹11.46 L sanctioned
₹8.03 L spent (70%)
09
Constr of Food Grain storage
1 works
₹8.05 L sanctioned
₹8.00 L spent (99%)
10
Constr of Cement Concrete Roads
9 works
₹6.92 L sanctioned
₹4.19 L spent (61%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 175 0.32 0.32
99%
2 Plantation 123 0.22 0.06
28%
3 Construction of Toilets 57 0.03 0.03
96%
4 Farm Pond 13 0.11 0.08
70%
5 Constr of Cement Concrete Roads 9 0.07 0.04
61%
6 Construction of Check Dam/Stop Dam 8 1.11 0.88
79%
7 Construction of Road and Culvert 6 0.38 0.32
84%
8 Land Development 6 0.06 0.03
52%
9 Construction of Trench 5 0.20 0.17
85%
10 Repair & maint of Water Harvesting Structures 5 0.13 0.11
90%
11 Construction of Bund 3 0.05 0.04
78%
12 Repair & maint of Road 2 0.01 0.01
88%
13 Construction of Tank 2 0.31 0.30
96%
14 Boulder Check/Gully Plug 1 0.05 0.04
86%
15 Constr of Compound wall 1 0.06 0.05
86%
16 Constr of Food Grain storage 1 0.08 0.08
99%
17 Construction of Crematorium 1 0.05 0.03
62%
18 Construction of NADEP/Vermi Compost Pit 1 0.00 0.00
77%
19 Construction of Percolation Tank 1 0.04 0.03
75%
20 Construction of Well 1 0.03 0.02
75%
21 Renovation of traditional water bodies 1 0.05 0.05
100%
22 Repair & maint of Pond/ Tank 1 0.02 0.01
84%
23 Terracing 1 0.04 0.03
86%
Total 424 3.41 2.74
All 23 rows (zero-value rows hidden) ⇩ Export to Excel