Works completed
462
Sanctioned (pure scheme)
₹12.28 Cr
Expenditure since inception
₹10.19 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
35 works
₹2.09 Cr sanctioned
₹1.78 Cr spent (85%)
02
Construction of Percolation Tank
11 works
₹1.53 Cr sanctioned
₹1.45 Cr spent (95%)
03
Farm Pond
53 works
₹1.20 Cr sanctioned
₹87.20 L spent (73%)
04
Plantation
16 works
₹1.06 Cr sanctioned
₹68.80 L spent (65%)
05
Constr of Cement Concrete Roads
11 works
₹91.34 L sanctioned
₹83.41 L spent (91%)
06
Construction of Well
26 works
₹90.29 L sanctioned
₹70.76 L spent (78%)
07
Construction of Tank
6 works
₹83.08 L sanctioned
₹80.73 L spent (97%)
08
Construction of Road and Culvert
19 works
₹78.83 L sanctioned
₹54.56 L spent (69%)
09
Construction of Trench
7 works
₹53.60 L sanctioned
₹49.66 L spent (93%)
10
Construction of Bund
30 works
₹50.97 L sanctioned
₹41.35 L spent (81%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 172 0.32 0.31
95%
2 Farm Pond 53 1.20 0.87
73%
3 Construction of Check Dam/Stop Dam 35 2.09 1.78
85%
4 Construction of Bund 30 0.51 0.41
81%
5 Construction of Well 26 0.90 0.71
78%
6 Land Development 24 0.40 0.30
74%
7 Cattle Shed 23 0.20 0.19
94%
8 Construction of Road and Culvert 19 0.79 0.55
69%
9 Plantation 16 1.06 0.69
65%
10 Constr of Cement Concrete Roads 11 0.91 0.83
91%
11 Construction of Percolation Tank 11 1.53 1.45
95%
12 Construction of Trench 7 0.54 0.50
93%
13 Construction of NADEP/Vermi Compost Pit 7 0.08 0.07
92%
14 Construction of Tank 6 0.83 0.81
97%
15 Boulder Check/Gully Plug 4 0.07 0.05
74%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.10 0.10
94%
17 Underground Dyke for Ground Water Recharge 3 0.14 0.12
85%
18 Construction of Recharge Pits 2 0.05 0.03
64%
19 Repaire and Maint of NADEP/Vermi Compost Pit 2 0.00 0.00
26%
20 Other Works 1 0.01 0.00
75%
21 Renovation of traditional water bodies 1 0.01 0.01
143%
22 Culvert 1 0.15 0.14
95%
23 Goat Shelter 1 0.01 0.00
12%
24 Construction of Play field 1 0.08 0.02
28%
25 Repair & maint of Percolation Tank 1 0.15 0.13
86%
26 Repair & maint of Pond/ Tank 1 0.15 0.14
93%
Total 462 12.28 10.19