Works completed
237
Sanctioned (pure scheme)
₹2.59 Cr
Expenditure since inception
₹1.77 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
83 works
₹54.19 L sanctioned
₹19.86 L spent (37%)
02
Land Development
31 works
₹50.08 L sanctioned
₹35.86 L spent (72%)
03
Construction of Road and Culvert
6 works
₹32.38 L sanctioned
₹24.25 L spent (75%)
04
Construction of Check Dam/Stop Dam
7 works
₹20.68 L sanctioned
₹16.91 L spent (82%)
05
Culvert
1 works
₹14.77 L sanctioned
₹14.27 L spent (97%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹13.54 L sanctioned
₹13.23 L spent (98%)
07
Farm Pond
17 works
₹11.24 L sanctioned
₹7.12 L spent (63%)
08
Rural Housing
51 works
₹10.85 L sanctioned
₹9.91 L spent (91%)
09
Repair & maint of Pond/ Tank
3 works
₹10.72 L sanctioned
₹4.69 L spent (44%)
10
Construction of Bund
7 works
₹10.39 L sanctioned
₹7.48 L spent (72%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Plantation 83 54.19 19.86
37%
2 Rural Housing 51 10.85 9.91
91%
3 Land Development 31 50.08 35.86
72%
4 Farm Pond 17 11.24 7.12
63%
5 Constr of Cement Concrete Roads 8 6.62 4.78
72%
6 Construction of NADEP/Vermi Compost Pit 8 0.96 0.92
95%
7 Construction of Check Dam/Stop Dam 7 20.68 16.91
82%
8 Construction of Bund 7 10.39 7.48
72%
9 Construction of Road and Culvert 6 32.38 24.25
75%
10 Repair & maint of Pond/ Tank 3 10.72 4.69
44%
11 Construction of Toilets 2 0.09 0.09
97%
12 Construction of Trench 2 6.95 5.29
76%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 13.54 13.23
98%
14 Construction of Well 2 4.14 2.26
55%
15 Terracing 1 1.80 1.80
100%
16 Repair & maint of Water Harvesting Structures 1 4.73 3.47
73%
17 Construction of Percolation Tank 1 2.03 1.95
96%
18 Well Recharge 1 0.29 0.29
101%
19 Culvert 1 14.77 14.27
97%
20 Construction of Recharge Pits 1 0.32 0.21
65%
21 Construction of Play field 1 1.80 1.76
98%
22 Construction of Tank 1 0.20 0.17
82%
Total 237 258.76 176.57