MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-09 08:33:24.811433
to
to
Reset filters
Scope
Works completed
634
Sanctioned (pure scheme)
₹8.00 Cr
Expenditure since inception
₹6.43 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
16 works
₹1.26 Cr sanctioned
₹1.32 Cr spent (104%)
02
Plantation
240 works
₹1.13 Cr sanctioned
₹55.66 L spent (49%)
03
Construction of Bund
34 works
₹1.09 Cr sanctioned
₹95.55 L spent (88%)
04
Construction of Check Dam/Stop Dam
36 works
₹88.25 L sanctioned
₹52.34 L spent (59%)
05
Construction of Trench
6 works
₹50.05 L sanctioned
₹47.58 L spent (95%)
06
Construction of Percolation Tank
1 works
₹49.40 L sanctioned
₹49.33 L spent (100%)
07
Land Development
60 works
₹43.42 L sanctioned
₹38.81 L spent (89%)
08
Works for Flood Control and Protection
5 works
₹43.37 L sanctioned
₹36.41 L spent (84%)
09
Construction of Well
12 works
₹36.24 L sanctioned
₹25.82 L spent (71%)
10
Farm Pond
26 works
₹32.41 L sanctioned
₹14.68 L spent (45%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Plantation 240 1.13 0.56
49%
2 Rural Housing 117 0.24 0.23
98%
3 Land Development 60 0.43 0.39
89%
4 Construction of Check Dam/Stop Dam 36 0.88 0.52
59%
5 Construction of Bund 34 1.09 0.96
88%
6 Repair & Maint of Community infrastructure 30 0.01 0.01
99%
7 Farm Pond 26 0.32 0.15
45%
8 Construction of NADEP/Vermi Compost Pit 22 0.03 0.03
85%
9 Construction of Road and Culvert 16 1.26 1.32
104%
10 Construction of Well 12 0.36 0.26
71%
11 Cattle Shed 9 0.09 0.07
85%
12 Construction of Trench 6 0.50 0.48
95%
13 Works for Flood Control and Protection 5 0.43 0.36
84%
14 Constr of Cement Concrete Roads 4 0.18 0.17
95%
15 Other Works 3 0.02 0.02
97%
16 Construction of Toilets 3 0.03 0.03
88%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.01 0.01
97%
18 Repair & maint of Pond/ Tank 2 0.05 0.05
86%
19 Solid and Liquid Waste Management 2 0.01 0.00
37%
20 Renovation of traditional water bodies 1 0.16 0.12
74%
21 Repair & Maint of Canal 1 0.08 0.07
89%
22 Repair & Maint of Check Dam/Stop Dam 1 0.05 0.05
91%
23 Construction of Percolation Tank 1 0.49 0.49
100%
24 Repair & maint of Water Harvesting Structures 1 0.13 0.10
75%
Total 634 8.00 6.43
All 24 rows (zero-value rows hidden) ⇩ Export to Excel