MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
319
Sanctioned (pure scheme)
₹2.90 Cr
Expenditure since inception
₹2.50 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
9 works
₹53.66 L sanctioned
₹46.64 L spent (87%)
02
Construction of Percolation Tank
1 works
₹49.96 L sanctioned
₹49.53 L spent (99%)
03
Land Development
40 works
₹29.55 L sanctioned
₹25.03 L spent (85%)
04
Rural Housing
112 works
₹23.68 L sanctioned
₹23.46 L spent (99%)
05
Works for Flood Control and Protection
2 works
₹16.47 L sanctioned
₹10.47 L spent (64%)
06
Construction of Trench
2 works
₹15.44 L sanctioned
₹12.02 L spent (78%)
07
Repair & maint of Road
1 works
₹15.00 L sanctioned
₹14.83 L spent (99%)
08
Plantation
11 works
₹13.20 L sanctioned
₹4.65 L spent (35%)
09
Culvert
1 works
₹13.09 L sanctioned
₹12.28 L spent (94%)
10
Construction of Bund
6 works
₹9.50 L sanctioned
₹6.77 L spent (71%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 112 23.68 23.46
99%
2 Construction of NADEP/Vermi Compost Pit 93 8.46 7.26
86%
3 Land Development 40 29.55 25.03
85%
4 Plantation 11 13.20 4.65
35%
5 Farm Pond 10 4.91 3.04
62%
6 Solid and Liquid Waste Management 9 1.32 0.87
66%
7 Construction of Road and Culvert 9 53.66 46.64
87%
8 Construction of Bund 6 9.50 6.77
71%
9 Construction of Check Dam/Stop Dam 5 6.18 7.43
120%
10 Constr of Cement Concrete Roads 5 3.85 1.98
52%
11 Construction of Well 3 6.48 6.38
99%
12 Works for Flood Control and Protection 2 16.47 10.47
64%
13 Construction of Toilets 2 0.88 0.87
99%
14 Construction of Trench 2 15.44 12.02
78%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 3.02 2.23
74%
16 Repair & Maint of Community infrastructure 2 8.45 7.91
94%
17 Construction of Percolation Tank 1 49.96 49.53
99%
18 Repair & maint of Road 1 15.00 14.83
99%
19 Constr of Food Grain storage 1 0.69 0.69
99%
20 Renovation of traditional water bodies 1 1.25 0.55
44%
21 Culvert 1 13.09 12.28
94%
22 Construction of Recharge Pits 1 5.15 4.68
91%
Total 319 290.18 249.56
All 22 rows (zero-value rows hidden) ⇩ Export to Excel