Works completed
597
Sanctioned (pure scheme)
₹4.09 Cr
Expenditure since inception
₹2.98 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
37 works
₹62.65 L sanctioned
₹49.29 L spent (79%)
02
Construction of Well
31 works
₹62.27 L sanctioned
₹52.50 L spent (84%)
03
Construction of Road and Culvert
11 works
₹62.13 L sanctioned
₹57.87 L spent (93%)
04
Rural Housing
309 works
₹56.07 L sanctioned
₹51.81 L spent (92%)
05
Land Development
92 works
₹52.89 L sanctioned
₹22.27 L spent (42%)
06
Plantation
17 works
₹40.60 L sanctioned
₹8.22 L spent (20%)
07
Repair & maint of Pond/ Tank
3 works
₹11.76 L sanctioned
₹8.87 L spent (75%)
08
Construction of Check Dam/Stop Dam
13 works
₹8.56 L sanctioned
₹7.22 L spent (84%)
09
Constr of Cement Concrete Roads
7 works
₹7.84 L sanctioned
₹4.69 L spent (60%)
10
Construction of Trench
1 works
₹7.28 L sanctioned
₹6.20 L spent (85%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 309 56.07 51.81
92%
2 Land Development 92 52.89 22.27
42%
3 Farm Pond 37 62.65 49.29
79%
4 Construction of Toilets 36 2.80 2.68
96%
5 Construction of Well 31 62.27 52.50
84%
6 Plantation 17 40.60 8.22
20%
7 Construction of Check Dam/Stop Dam 13 8.56 7.22
84%
8 Construction of Road and Culvert 11 62.13 57.87
93%
9 Construction of NADEP/Vermi Compost Pit 9 1.71 1.67
98%
10 Construction of Bund 7 6.86 4.75
69%
11 Renovation of traditional water bodies 7 2.51 2.60
103%
12 Constr of Cement Concrete Roads 7 7.84 4.69
60%
13 Construction of Percolation Tank 6 3.72 3.05
82%
14 Repair & maint of Pond/ Tank 3 11.76 8.87
75%
15 Cattle Shed 2 2.21 2.08
94%
16 Construction of Crematorium 2 3.20 2.40
75%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.59 0.51
87%
18 Well Recharge 1 0.26 0.00
1%
19 Constr of Kitchen Shed 1 0.46 0.46
100%
20 Terracing 1 2.48 1.59
64%
21 Culvert 1 6.30 3.64
58%
22 Construction of Trench 1 7.28 6.20
85%
23 Repair & Maint of Check Dam/Stop Dam 1 4.01 3.70
92%
Total 597 409.16 298.08
All 23 rows (zero-value rows hidden) ⇩ Export to Excel