Showcase — Completed Works

Rollup last refreshed: 2026-09-19 07:03:09.195652
to
to
Reset filters
Scope
Works completed
202
Sanctioned (pure scheme)
₹3.96 Cr
Expenditure since inception
₹3.10 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹89.01 L sanctioned
₹71.56 L spent (80%)
02
Works for Flood Control and Protection
16 works
₹72.08 L sanctioned
₹56.54 L spent (78%)
03
Constr of Cement Concrete Roads
11 works
₹33.48 L sanctioned
₹30.57 L spent (91%)
04
Plantation
9 works
₹30.62 L sanctioned
₹11.69 L spent (38%)
05
Land Development
6 works
₹22.19 L sanctioned
₹19.16 L spent (86%)
06
Rural Housing
103 works
₹20.40 L sanctioned
₹19.11 L spent (94%)
07
Construction of Bund
3 works
₹19.88 L sanctioned
₹15.51 L spent (78%)
08
Repair & Maint of Canal
2 works
₹14.76 L sanctioned
₹12.42 L spent (84%)
09
Repair & maint of Pond/ Tank
3 works
₹11.08 L sanctioned
₹8.93 L spent (81%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹11.07 L sanctioned
₹9.37 L spent (85%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 103 20.40 19.11
94%
2 Works for Flood Control and Protection 16 72.08 56.54
78%
3 Construction of Road and Culvert 15 89.01 71.56
80%
4 Constr of Cement Concrete Roads 11 33.48 30.57
91%
5 Plantation 9 30.62 11.69
38%
6 Land Development 6 22.19 19.16
86%
7 Well Recharge 5 1.29 0.76
59%
8 Farm Pond 4 7.49 4.57
61%
9 Construction of Bund 3 19.88 15.51
78%
10 Construction of Well 3 10.05 6.61
66%
11 Repair & maint of Pond/ Tank 3 11.08 8.93
81%
12 Solid and Liquid Waste Management 3 2.10 1.91
91%
13 Construction of building/workshed for SHG 2 3.91 3.25
83%
14 Construction of Check Dam/Stop Dam 2 5.63 4.10
73%
15 Construction of NADEP/Vermi Compost Pit 2 1.30 1.01
78%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 11.07 9.37
85%
17 Poultry Shelter 2 1.42 0.77
54%
18 Repair & Maint of Canal 2 14.76 12.42
84%
19 Constr of Compound wall 1 1.08 0.97
90%
20 Deepening / Desilting of Flood Channels 1 4.86 4.41
91%
21 Construction of Tank 1 10.80 9.45
87%
22 Goat Shelter 1 0.48 0.45
94%
23 Construction of Percolation Tank 1 9.97 7.82
78%
24 Construction of Crematorium 1 3.51 3.16
90%
25 Construction of Trench 1 3.93 3.31
84%
26 Strengthening of Embankment 1 3.53 2.78
79%
27 Construction of Toilets 1 0.40 0.18
47%
Total 202 396.34 310.39
All 27 rows (zero-value rows hidden) ⇩ Export to Excel