Scope
Works completed
344
Sanctioned (pure scheme)
₹4.02 Cr
Expenditure since inception
₹3.18 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
19 works
₹91.47 L sanctioned
₹77.29 L spent (85%)
02
Land Development
16 works
₹46.33 L sanctioned
₹39.36 L spent (85%)
03
Works for Flood Control and Protection
8 works
₹39.31 L sanctioned
₹34.05 L spent (87%)
04
Construction of Check Dam/Stop Dam
14 works
₹36.58 L sanctioned
₹30.69 L spent (84%)
05
Rural Housing
174 works
₹35.92 L sanctioned
₹34.71 L spent (97%)
06
Plantation
17 works
₹33.27 L sanctioned
₹6.96 L spent (21%)
07
Constr of Cement Concrete Roads
6 works
₹20.86 L sanctioned
₹19.04 L spent (91%)
08
Farm Pond
53 works
₹19.42 L sanctioned
₹16.70 L spent (86%)
09
Construction of Bund
11 works
₹10.98 L sanctioned
₹8.96 L spent (82%)
10
Construction of Percolation Tank
1 works
₹9.85 L sanctioned
₹6.95 L spent (71%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 174 35.92 34.71
97%
2 Farm Pond 53 19.42 16.70
86%
3 Construction of Road and Culvert 19 91.47 77.29
85%
4 Plantation 17 33.27 6.96
21%
5 Land Development 16 46.33 39.36
85%
6 Construction of Check Dam/Stop Dam 14 36.58 30.69
84%
7 Construction of Bund 11 10.98 8.96
82%
8 Works for Flood Control and Protection 8 39.31 34.05
87%
9 Constr of Cement Concrete Roads 6 20.86 19.04
91%
10 Well Recharge 5 3.32 2.11
64%
11 Construction of Trench 3 4.94 2.42
49%
12 Deepening / Desilting of Flood Channels 2 9.21 8.47
92%
13 Construction of Well 2 6.52 4.50
69%
14 Constr of Kitchen Shed 2 0.52 0.33
64%
15 Construction of NADEP/Vermi Compost Pit 1 0.62 0.59
94%
16 Construction of Tank 1 1.00 0.66
66%
17 Boulder Check/Gully Plug 1 2.14 0.92
43%
18 Culvert 1 4.98 4.79
96%
19 Cattle Shed 1 1.13 1.08
96%
20 Construction of Play field 1 1.86 1.72
92%
21 Construction of Recharge Pits 1 0.92 0.01
2%
22 Construction of Embankment 1 4.10 3.93
96%
23 Construction of Canal 1 3.24 2.94
91%
24 Repair & maint of Percolation Tank 1 6.54 4.41
67%
25 Repair & maint of Pond/ Tank 1 6.99 4.61
66%
26 Construction of Percolation Tank 1 9.85 6.95
71%
Total 344 402.04 318.17
All 26 rows (zero-value rows hidden) ⇩ Export to Excel