MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-10-21 07:05:18.038005
to
to
Reset filters
Scope
Works completed
437
Sanctioned (pure scheme)
₹3.97 Cr
Expenditure since inception
₹2.93 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
16 works
₹60.16 L sanctioned
₹44.22 L spent (74%)
02
Land Development
67 works
₹42.95 L sanctioned
₹36.25 L spent (84%)
03
Construction of Check Dam/Stop Dam
23 works
₹42.11 L sanctioned
₹29.77 L spent (71%)
04
Strengthening of Embankment
2 works
₹27.38 L sanctioned
₹12.04 L spent (44%)
05
Rural Housing
142 works
₹26.19 L sanctioned
₹26.04 L spent (99%)
06
Constr of Cement Concrete Roads
19 works
₹24.52 L sanctioned
₹12.88 L spent (53%)
07
Plantation
8 works
₹21.07 L sanctioned
₹9.59 L spent (46%)
08
Works for Flood Control and Protection
7 works
₹18.04 L sanctioned
₹18.24 L spent (101%)
09
Repair & Maint of Check Dam/Stop Dam
1 works
₹15.00 L sanctioned
₹12.64 L spent (84%)
10
Lining of Canal
1 works
₹14.90 L sanctioned
₹10.00 L spent (67%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 142 26.19 26.04
99%
2 Construction of Toilets 93 7.78 7.65
98%
3 Land Development 67 42.95 36.25
84%
4 Construction of Check Dam/Stop Dam 23 42.11 29.77
71%
5 Constr of Cement Concrete Roads 19 24.52 12.88
53%
6 Construction of Road and Culvert 16 60.16 44.22
74%
7 Construction of Bund 12 6.40 4.74
74%
8 Solid and Liquid Waste Management 10 13.59 12.67
93%
9 Plantation 8 21.07 9.59
46%
10 Works for Flood Control and Protection 7 18.04 18.24
101%
11 Cattle Shed 5 4.85 3.74
77%
12 Construction of NADEP/Vermi Compost Pit 5 2.65 2.49
94%
13 Construction of Well 5 10.64 6.72
63%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 4.80 3.40
71%
15 Construction of Percolation Tank 3 5.96 4.85
81%
16 Strengthening of Embankment 2 27.38 12.04
44%
17 Construction of Trench 2 7.11 3.03
43%
18 Farm Pond 2 4.56 1.82
40%
19 Constr of Aganwadi 2 6.24 5.14
82%
20 Underground Dyke for Ground Water Recharge 2 5.58 5.08
91%
21 Construction of Tank 1 2.18 1.62
74%
22 Culvert 1 6.24 6.15
99%
23 Lining of Canal 1 14.90 10.00
67%
24 Repair & Maint of Canal 1 6.59 4.16
63%
25 Repair & Maint of Check Dam/Stop Dam 1 15.00 12.64
84%
26 Repair & maint of Pond/ Tank 1 0.50 0.40
80%
27 Construction of Fish Drying Infrastructure 1 1.21 1.11
92%
28 Construction of Embankment 1 7.07 5.95
84%
29 Well Recharge 1 0.27 0.26
94%
Total 437 396.55 292.67
All 29 rows (zero-value rows hidden) ⇩ Export to Excel