Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
594
Sanctioned (pure scheme)
₹2.88 Cr
Expenditure since inception
₹3.13 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
11 works
₹58.48 L sanctioned
₹51.08 L spent (87%)
02
Rural Housing
228 works
₹42.63 L sanctioned
₹41.92 L spent (98%)
03
Construction of Road and Culvert
24 works
₹39.01 L sanctioned
₹93.86 L spent (241%)
04
Construction of Bund
120 works
₹35.28 L sanctioned
₹30.91 L spent (88%)
05
Plantation
9 works
₹20.51 L sanctioned
₹14.69 L spent (72%)
06
Constr of Cement Concrete Roads
23 works
₹17.72 L sanctioned
₹13.68 L spent (77%)
07
Land Development
14 works
₹12.10 L sanctioned
₹7.99 L spent (66%)
08
Deepening / Desilting of Flood Channels
2 works
₹10.54 L sanctioned
₹9.44 L spent (90%)
09
Construction of Toilets
97 works
₹10.20 L sanctioned
₹7.74 L spent (76%)
10
Construction of Percolation Tank
2 works
₹9.56 L sanctioned
₹8.51 L spent (89%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 228 42.63 41.92
98%
2 Construction of Bund 120 35.28 30.91
88%
3 Construction of Toilets 97 10.20 7.74
76%
4 Construction of NADEP/Vermi Compost Pit 28 4.62 4.37
95%
5 Construction of Road and Culvert 24 39.01 93.86
241%
6 Constr of Cement Concrete Roads 23 17.72 13.68
77%
7 Construction of Trench 14 0.00 6.59
0%
8 Land Development 14 12.10 7.99
66%
9 Works for Flood Control and Protection 11 58.48 51.08
87%
10 Plantation 9 20.51 14.69
72%
11 Construction of Check Dam/Stop Dam 7 5.03 4.96
99%
12 Farm Pond 5 5.82 2.69
46%
13 Deepening / Desilting of Flood Channels 2 10.54 9.44
90%
14 Construction of Percolation Tank 2 9.56 8.51
89%
15 Repair & maint of Water Harvesting Structures 2 6.20 5.32
86%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 1.24 1.23
99%
17 Constr of Kitchen Shed 1 0.19 0.18
97%
18 Construction of building/workshed for SHG 1 0.63 0.65
103%
19 Construction of Crematorium 1 2.45 2.43
99%
20 Construction of Recharge Pits 1 0.05 0.04
77%
21 Construction of Tank 1 3.94 3.43
87%
22 Community Sanitary Complex 1 0.75 0.75
100%
23 Solid and Liquid Waste Management 1 0.78 0.72
93%
Total 594 287.73 313.18
All 23 rows (zero-value rows hidden) ⇩ Export to Excel