MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-04 08:29:21.124578
to
to
Reset filters
Scope
Works completed
153
Sanctioned (pure scheme)
₹4.06 Cr
Expenditure since inception
₹3.54 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
7 works
₹90.55 L sanctioned
₹84.71 L spent (94%)
02
Construction of Percolation Tank
9 works
₹54.65 L sanctioned
₹46.37 L spent (85%)
03
Construction of Well
14 works
₹49.62 L sanctioned
₹49.14 L spent (99%)
04
Works for Flood Control and Protection
12 works
₹41.27 L sanctioned
₹39.91 L spent (97%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹36.10 L sanctioned
₹33.67 L spent (93%)
06
Constr of Cement Concrete Roads
27 works
₹27.72 L sanctioned
₹19.49 L spent (70%)
07
Repair & maint of Pond/ Tank
5 works
₹15.81 L sanctioned
₹13.64 L spent (86%)
08
Plantation
9 works
₹14.95 L sanctioned
₹8.29 L spent (55%)
09
Farm Pond
4 works
₹12.62 L sanctioned
₹11.22 L spent (89%)
10
Construction of Check Dam/Stop Dam
4 works
₹11.00 L sanctioned
₹9.83 L spent (89%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Constr of Cement Concrete Roads 27 27.72 19.49
70%
2 Rural Housing 24 4.24 4.24
100%
3 Construction of Well 14 49.62 49.14
99%
4 Works for Flood Control and Protection 12 41.27 39.91
97%
5 Plantation 9 14.95 8.29
56%
6 Construction of Percolation Tank 9 54.65 46.37
85%
7 Construction of Road and Culvert 7 90.55 84.71
94%
8 Construction of Bund 6 3.76 3.03
81%
9 Construction of NADEP/Vermi Compost Pit 6 2.88 2.84
99%
10 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 36.10 33.67
93%
11 Repair & maint of Pond/ Tank 5 15.81 13.64
86%
12 Construction of Check Dam/Stop Dam 4 11.00 9.83
89%
13 Solid and Liquid Waste Management 4 0.22 0.21
98%
14 Farm Pond 4 12.62 11.22
89%
15 Well Recharge 4 4.91 3.23
66%
16 Construction of Crematorium 4 7.36 6.90
94%
17 Construction of Toilets 2 0.24 0.24
99%
18 Construction of Play field 2 4.41 2.81
64%
19 Construction of Tank 1 1.96 1.93
99%
20 Constr of Gabion 1 4.82 1.64
34%
21 Land Development 1 7.82 7.24
93%
22 Constr of Compound wall 1 8.91 2.70
30%
23 Community Sanitary Complex 1 0.44 0.38
87%
Total 153 406.23 353.67
All 23 rows (zero-value rows hidden) ⇩ Export to Excel