Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
560
Sanctioned (pure scheme)
₹3.97 Cr
Expenditure since inception
₹3.15 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
42 works
₹86.51 L sanctioned
₹68.51 L spent (79%)
02
Rural Housing
324 works
₹59.19 L sanctioned
₹56.92 L spent (96%)
03
Construction of Well
26 works
₹58.35 L sanctioned
₹51.65 L spent (89%)
04
Construction of Trench
10 works
₹56.31 L sanctioned
₹38.48 L spent (68%)
05
Constr of Cement Concrete Roads
15 works
₹25.40 L sanctioned
₹18.88 L spent (74%)
06
Construction of Bund
41 works
₹17.25 L sanctioned
₹14.89 L spent (86%)
07
Constr of GP Bhawan
1 works
₹14.85 L sanctioned
₹5.72 L spent (39%)
08
Farm Pond
8 works
₹14.62 L sanctioned
₹10.48 L spent (72%)
09
Construction of Road and Culvert
3 works
₹14.26 L sanctioned
₹12.43 L spent (87%)
10
Plantation
6 works
₹8.77 L sanctioned
₹3.41 L spent (39%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 324 59.19 56.92
96%
2 Construction of Toilets 55 5.97 5.80
97%
3 Construction of Check Dam/Stop Dam 42 86.51 68.51
79%
4 Construction of Bund 41 17.25 14.89
86%
5 Construction of Well 26 58.35 51.65
89%
6 Repair & maint of Water Harvesting Structures 15 7.40 4.01
54%
7 Constr of Cement Concrete Roads 15 25.40 18.88
74%
8 Construction of Trench 10 56.31 38.48
68%
9 Farm Pond 8 14.62 10.48
72%
10 Plantation 6 8.77 3.41
39%
11 Land Development 3 5.02 3.14
63%
12 Construction of Road and Culvert 3 14.26 12.43
87%
13 Construction of Tank 2 0.30 0.14
47%
14 Boulder Check/Gully Plug 1 0.53 0.25
47%
15 Constr of Gabion 1 4.98 4.42
89%
16 Constr of GP Bhawan 1 14.85 5.72
39%
17 Construction of Crematorium 1 1.80 1.80
100%
18 Construction of NADEP/Vermi Compost Pit 1 0.15 0.13
86%
19 Construction of Percolation Tank 1 4.99 4.98
100%
20 Construction of Play field 1 1.87 1.66
89%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 4.80 4.69
98%
22 Repair & maint of Percolation Tank 1 0.88 0.41
47%
23 Well Recharge 1 2.39 2.27
95%
Total 560 396.60 315.08
All 23 rows (zero-value rows hidden) ⇩ Export to Excel