Showcase — Completed Works

Rollup last refreshed: 2026-08-05 08:30:05.836701
to
to
Reset filters
Scope
Works completed
651
Sanctioned (pure scheme)
₹8.37 Cr
Expenditure since inception
₹6.26 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
173 works
₹3.42 Cr sanctioned
₹2.58 Cr spent (75%)
02
Construction of Road and Culvert
31 works
₹1.43 Cr sanctioned
₹97.69 L spent (68%)
03
Construction of Bund
78 works
₹61.99 L sanctioned
₹53.43 L spent (86%)
04
Land Development
79 works
₹59.83 L sanctioned
₹51.63 L spent (86%)
05
Plantation
17 works
₹35.15 L sanctioned
₹17.30 L spent (49%)
06
Well Recharge
11 works
₹27.26 L sanctioned
₹16.01 L spent (59%)
07
Farm Pond
87 works
₹25.12 L sanctioned
₹21.16 L spent (84%)
08
Constr of Aganwadi
3 works
₹23.40 L sanctioned
₹10.07 L spent (43%)
09
Construction of Well
9 works
₹21.61 L sanctioned
₹16.27 L spent (75%)
10
Rural Housing
96 works
₹19.47 L sanctioned
₹18.97 L spent (97%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Check Dam/Stop Dam 173 3.42 2.58
75%
2 Rural Housing 96 0.19 0.19
97%
3 Farm Pond 87 0.25 0.21
84%
4 Land Development 79 0.60 0.52
86%
5 Construction of Bund 78 0.62 0.53
86%
6 Construction of Road and Culvert 31 1.43 0.98
69%
7 Construction of NADEP/Vermi Compost Pit 23 0.05 0.05
84%
8 Plantation 17 0.35 0.17
49%
9 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 12 0.04 0.03
85%
10 Constr of Cement Concrete Roads 11 0.11 0.08
77%
11 Well Recharge 11 0.27 0.16
59%
12 Construction of Well 9 0.22 0.16
75%
13 Construction of Percolation Tank 4 0.14 0.12
82%
14 Deepening / Desilting of Flood Channels 4 0.05 0.01
30%
15 Constr of Aganwadi 3 0.23 0.10
43%
16 Construction of Trench 3 0.18 0.19
105%
17 Boulder Check/Gully Plug 2 0.01 0.00
51%
18 Construction of Toilets 1 0.00 0.00
100%
19 Construction of Tank 1 0.00 0.00
53%
20 Construction of Recharge Pits 1 0.00 0.00
78%
21 Construction of Crematorium 1 0.02 0.02
95%
22 Repair & Maint of Community infrastructure 1 0.00 0.00
154%
23 Constr of Food Grain storage 1 0.15 0.12
80%
24 Terracing 1 0.03 0.02
81%
25 Cattle Shed 1 0.01 0.01
91%
Total 651 8.37 6.26