Works completed
218
Sanctioned (pure scheme)
₹1.97 Cr
Expenditure since inception
₹1.60 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
9 works
₹52.02 L sanctioned
₹35.36 L spent (68%)
02
Construction of Check Dam/Stop Dam
10 works
₹26.73 L sanctioned
₹23.01 L spent (86%)
03
Rural Housing
120 works
₹21.12 L sanctioned
₹20.43 L spent (97%)
04
Farm Pond
11 works
₹20.54 L sanctioned
₹15.01 L spent (73%)
05
Land Development
17 works
₹18.74 L sanctioned
₹11.89 L spent (63%)
06
Constr of Cement Concrete Roads
12 works
₹11.34 L sanctioned
₹11.13 L spent (98%)
07
Repair & Maint of Community infrastructure
5 works
₹8.37 L sanctioned
₹3.93 L spent (47%)
08
Culvert
2 works
₹8.27 L sanctioned
₹4.68 L spent (57%)
09
Construction of Well
7 works
₹8.23 L sanctioned
₹6.55 L spent (80%)
10
Construction of Trench
4 works
₹6.42 L sanctioned
₹8.24 L spent (128%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 120 21.12 20.43
97%
2 Land Development 17 18.74 11.89
64%
3 Constr of Cement Concrete Roads 12 11.34 11.13
98%
4 Farm Pond 11 20.54 15.01
73%
5 Construction of Check Dam/Stop Dam 10 26.73 23.01
86%
6 Construction of Road and Culvert 9 52.02 35.36
68%
7 Construction of Well 7 8.23 6.55
80%
8 Repair & Maint of Community infrastructure 5 8.37 3.93
47%
9 Construction of Toilets 5 0.60 0.60
100%
10 Construction of Trench 4 6.42 8.24
128%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 2.14 5.33
249%
12 Well Recharge 2 0.52 0.22
43%
13 Boulder Check/Gully Plug 2 0.92 4.10
446%
14 Construction of Bund 2 4.92 3.33
68%
15 Culvert 2 8.27 4.68
57%
16 Solid and Liquid Waste Management 2 0.85 0.82
97%
17 Roof Water Harvesting on gov/panchayat bldg 1 2.94 2.38
81%
18 Constr of GP Bhawan 1 0.86 0.85
99%
19 Construction of Percolation Tank 1 0.46 2.08
451%
20 Bio-Fertilizer 1 0.57 0.29
51%
Total 218 196.57 160.23