Works completed
192
Sanctioned (pure scheme)
₹2.73 Cr
Expenditure since inception
₹2.04 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
12 works
₹1.05 Cr sanctioned
₹74.77 L spent (71%)
02
Constr of Cement Concrete Roads
11 works
₹30.20 L sanctioned
₹28.05 L spent (93%)
03
Construction of Check Dam/Stop Dam
4 works
₹24.21 L sanctioned
₹18.40 L spent (76%)
04
Farm Pond
25 works
₹15.88 L sanctioned
₹12.44 L spent (78%)
05
Repair & maint of Road
1 works
₹14.87 L sanctioned
₹12.85 L spent (86%)
06
Construction of Percolation Tank
3 works
₹14.71 L sanctioned
₹8.29 L spent (56%)
07
Rural Housing
75 works
₹14.18 L sanctioned
₹13.18 L spent (93%)
08
Land Development
22 works
₹10.72 L sanctioned
₹10.05 L spent (94%)
09
Construction of Bund
4 works
₹8.99 L sanctioned
₹7.01 L spent (78%)
10
Construction of Crematorium
3 works
₹5.40 L sanctioned
₹3.70 L spent (69%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 75 0.14 0.13
93%
2 Farm Pond 25 0.16 0.12
78%
3 Land Development 22 0.11 0.10
94%
4 Construction of NADEP/Vermi Compost Pit 15 0.02 0.00
18%
5 Construction of Road and Culvert 12 1.05 0.75
71%
6 Constr of Cement Concrete Roads 11 0.30 0.28
93%
7 Construction of Check Dam/Stop Dam 4 0.24 0.18
76%
8 Construction of Bund 4 0.09 0.07
78%
9 Construction of Crematorium 3 0.05 0.04
69%
10 Construction of Percolation Tank 3 0.15 0.08
56%
11 Plantation 3 0.04 0.02
54%
12 Boulder Check/Gully Plug 2 0.01 0.01
54%
13 Cattle Shed 2 0.02 0.01
73%
14 Well Recharge 2 0.01 0.00
37%
15 Construction of Play field 1 0.04 0.00
6%
16 Repair & maint of Percolation Tank 1 0.05 0.03
62%
17 Culvert 1 0.04 0.04
98%
18 Repair & maint of Road 1 0.15 0.13
87%
19 Constr of GP Bhawan 1 0.01 0.01
92%
20 Construction of Recharge Pits 1 0.01 0.01
83%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.01 0.00
48%
22 Underground Dyke for Ground Water Recharge 1 0.01 0.00
43%
23 Construction of Tank 1 0.04 0.01
33%
Total 192 2.73 2.04