MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-10-19 07:04:39.053416
to
to
Reset filters
Scope
Works completed
90,79,302
Sanctioned (pure scheme)
₹107,859.43 Cr
Expenditure since inception
₹73,534.94 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
2,19,047 works
₹15,138.27 Cr sanctioned
₹10,389.94 Cr spent (69%)
02
Construction of Check Dam/Stop Dam
4,30,259 works
₹15,075.58 Cr sanctioned
₹10,450.66 Cr spent (69%)
03
Land Development
5,40,962 works
₹8,809.40 Cr sanctioned
₹3,101.14 Cr spent (35%)
04
Plantation
3,66,123 works
₹8,795.81 Cr sanctioned
₹3,460.38 Cr spent (39%)
05
Rural Housing
45,41,392 works
₹8,269.34 Cr sanctioned
₹7,843.38 Cr spent (95%)
06
Construction of Well
3,81,758 works
₹8,208.52 Cr sanctioned
₹6,514.77 Cr spent (79%)
07
Construction of Bund
2,86,925 works
₹6,525.52 Cr sanctioned
₹3,444.55 Cr spent (53%)
08
Farm Pond
3,93,620 works
₹5,793.60 Cr sanctioned
₹3,650.13 Cr spent (63%)
09
Constr of Cement Concrete Roads
3,84,020 works
₹5,385.11 Cr sanctioned
₹3,991.01 Cr spent (74%)
10
Construction of Trench
1,03,020 works
₹3,755.50 Cr sanctioned
₹3,019.36 Cr spent (80%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 45,41,392 8,269.34 7,843.38
95%
2 Land Development 5,40,962 8,809.40 3,101.14
35%
3 Construction of Toilets 4,78,819 545.48 456.68
84%
4 Construction of Check Dam/Stop Dam 4,30,259 15,075.58 10,450.66
69%
5 Farm Pond 3,93,620 5,793.60 3,650.13
63%
6 Constr of Cement Concrete Roads 3,84,020 5,385.11 3,991.01
74%
7 Construction of Well 3,81,758 8,208.52 6,514.77
79%
8 Plantation 3,66,123 8,795.81 3,460.38
39%
9 Construction of Bund 2,86,925 6,525.52 3,444.55
53%
10 Construction of Road and Culvert 2,19,047 15,138.27 10,389.94
69%
11 Construction of NADEP/Vermi Compost Pit 1,36,479 404.64 286.22
71%
12 Cattle Shed 1,12,214 1,509.18 1,300.42
86%
13 Construction of Trench 1,03,020 3,755.50 3,019.36
80%
14 Solid and Liquid Waste Management 71,227 507.02 425.61
84%
15 Well Recharge 64,980 887.50 666.51
75%
16 Construction of Percolation Tank 61,017 3,011.64 2,526.97
84%
17 Construction of Recharge Pits 54,769 337.86 254.00
75%
18 Construction of Tank 46,357 2,521.31 2,120.12
84%
19 Boulder Check/Gully Plug 43,925 916.42 686.93
75%
20 Renovation of traditional water bodies 35,023 846.10 578.96
68%
21 Repair & maint of Pond/ Tank 31,840 1,367.32 1,123.31
82%
22 Construction of Crematorium 26,991 702.82 545.27
78%
23 Constr of Gabion 20,542 498.49 429.73
86%
24 Constr of Aganwadi 18,007 523.90 414.90
79%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 17,922 669.16 498.63
75%
26 Construction of Play field 17,012 582.25 351.07
60%
27 Works for Flood Control and Protection 16,337 957.74 812.67
85%
28 Goat Shelter 16,003 116.18 86.03
74%
29 Constr of GP Bhawan 15,949 905.26 666.84
74%
30 Culvert 15,465 578.00 513.97
89%
31 Community Sanitary Complex 12,864 67.18 54.97
82%
32 Terracing 12,827 279.76 223.15
80%
33 Roof Water Harvesting on gov/panchayat bldg 10,981 99.55 79.26
80%
34 Constr of Compound wall 8,848 240.48 211.24
88%
35 Repair & maint of Water Harvesting Structures 7,819 256.48 209.62
82%
36 Repair & Maint of Check Dam/Stop Dam 7,222 366.77 310.27
85%
37 Underground Dyke for Ground Water Recharge 6,842 260.17 208.54
80%
38 Repair & Maint of Community infrastructure 6,275 169.63 118.45
70%
39 Repair & maint of Road 6,011 300.89 257.82
86%
40 Poultry Shelter 5,615 61.72 54.42
88%
41 Other Works 4,351 73.96 48.85
66%
42 Constr of Food Grain storage 4,055 205.95 186.67
91%
43 Repair & Maint of Bund 3,321 106.92 88.78
83%
44 Constr of Kitchen Shed 3,251 15.53 12.49
80%
45 Nursery Development 3,131 110.83 36.28
33%
46 Deepening / Desilting of Flood Channels 3,075 157.01 68.28
44%
47 Repair & maint of Percolation Tank 2,991 147.79 124.32
84%
48 Construction of Embankment 2,305 155.82 131.91
85%
49 Construction of Spur 2,110 110.22 93.42
85%
50 Repaire and Maint of NADEP/Vermi Compost Pit 2,074 10.98 9.33
85%
51 Construction of Canal 1,811 78.40 61.96
79%
52 Construction of Fish Drying Infrastructure 1,801 56.19 46.08
82%
53 Construction of Other Community Building/Assets 1,762 44.26 30.10
68%
54 Construction of building/workshed for SHG 1,707 53.39 46.51
87%
55 Grass Land Development 1,416 71.13 41.73
59%
56 Bio-Fertilizer 1,328 18.27 14.06
77%
57 Renovation of Canal 1,247 33.39 24.76
74%
58 Repair & Maint of Canal 1,163 29.83 23.12
78%
59 Lining of Canal 766 39.90 32.09
80%
60 Strengthening of Embankment 674 23.75 22.38
94%
61 Fish Culture 404 18.45 14.30
78%
62 Construction of Village Haats 376 9.11 8.11
89%
63 Repair & Maint of Fish Drying Infrastructure 292 12.41 10.39
84%
64 Piggery Shelter 252 6.63 5.68
86%
65 Lift Irrigation 146 14.58 9.82
67%
66 Repair & maint of Gully Plugs 97 5.41 4.40
81%
67 Water Converation - Others 47 1.45 1.02
71%
68 Bio-gas plant 41 0.36 0.23
63%
Total 90,79,302 107,859.43 73,534.94
All 68 rows (zero-value rows hidden) ⇩ Export to Excel