MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-27 14:06:46.546602
to
to
Reset filters
Scope
Works completed
90,25,401
Sanctioned (pure scheme)
₹107,702.35 Cr
Expenditure since inception
₹73,400.59 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
2,19,026 works
₹15,135.82 Cr sanctioned
₹10,387.86 Cr spent (69%)
02
Construction of Check Dam/Stop Dam
4,30,219 works
₹15,073.02 Cr sanctioned
₹10,448.59 Cr spent (69%)
03
Land Development
5,40,950 works
₹8,809.00 Cr sanctioned
₹3,100.89 Cr spent (35%)
04
Plantation
3,65,981 works
₹8,792.36 Cr sanctioned
₹3,458.49 Cr spent (39%)
05
Construction of Well
3,81,664 works
₹8,205.87 Cr sanctioned
₹6,512.61 Cr spent (79%)
06
Rural Housing
44,88,379 works
₹8,138.26 Cr sanctioned
₹7,728.36 Cr spent (95%)
07
Construction of Bund
2,86,908 works
₹6,524.80 Cr sanctioned
₹3,444.08 Cr spent (53%)
08
Farm Pond
3,93,527 works
₹5,791.33 Cr sanctioned
₹3,648.65 Cr spent (63%)
09
Constr of Cement Concrete Roads
3,83,897 works
₹5,383.50 Cr sanctioned
₹3,989.61 Cr spent (74%)
10
Construction of Trench
1,03,002 works
₹3,754.31 Cr sanctioned
₹3,018.45 Cr spent (80%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 44,88,379 8,138.26 7,728.36
95%
2 Land Development 5,40,950 8,809.00 3,100.89
35%
3 Construction of Toilets 4,78,816 545.46 456.67
84%
4 Construction of Check Dam/Stop Dam 4,30,219 15,073.02 10,448.59
69%
5 Farm Pond 3,93,527 5,791.33 3,648.65
63%
6 Constr of Cement Concrete Roads 3,83,897 5,383.50 3,989.61
74%
7 Construction of Well 3,81,664 8,205.87 6,512.61
79%
8 Plantation 3,65,981 8,792.36 3,458.49
39%
9 Construction of Bund 2,86,908 6,524.80 3,444.08
53%
10 Construction of Road and Culvert 2,19,026 15,135.82 10,387.86
69%
11 Construction of NADEP/Vermi Compost Pit 1,36,467 404.61 286.20
71%
12 Cattle Shed 1,12,194 1,508.96 1,300.27
86%
13 Construction of Trench 1,03,002 3,754.31 3,018.45
80%
14 Solid and Liquid Waste Management 71,194 506.83 425.45
84%
15 Well Recharge 64,866 886.84 666.17
75%
16 Construction of Percolation Tank 61,003 3,011.12 2,526.56
84%
17 Construction of Recharge Pits 54,759 337.82 253.98
75%
18 Construction of Tank 46,335 2,518.94 2,118.17
84%
19 Boulder Check/Gully Plug 43,912 916.24 686.87
75%
20 Renovation of traditional water bodies 35,023 846.10 578.96
68%
21 Repair & maint of Pond/ Tank 31,833 1,367.02 1,123.10
82%
22 Construction of Crematorium 26,989 702.79 545.25
78%
23 Constr of Gabion 20,534 498.29 429.54
86%
24 Constr of Aganwadi 17,996 523.41 414.53
79%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 17,922 669.16 498.63
75%
26 Construction of Play field 17,011 582.21 351.06
60%
27 Works for Flood Control and Protection 16,336 957.59 812.53
85%
28 Goat Shelter 16,003 116.18 86.03
74%
29 Constr of GP Bhawan 15,938 904.71 666.49
74%
30 Culvert 15,460 577.64 513.77
89%
31 Community Sanitary Complex 12,858 67.15 54.94
82%
32 Terracing 12,824 279.68 223.11
80%
33 Roof Water Harvesting on gov/panchayat bldg 10,970 99.46 79.19
80%
34 Constr of Compound wall 8,844 240.17 211.06
88%
35 Repair & maint of Water Harvesting Structures 7,818 256.34 209.48
82%
36 Repair & Maint of Check Dam/Stop Dam 7,222 366.77 310.27
85%
37 Underground Dyke for Ground Water Recharge 6,842 260.17 208.54
80%
38 Repair & Maint of Community infrastructure 6,274 169.24 118.07
70%
39 Repair & maint of Road 6,008 300.70 257.65
86%
40 Poultry Shelter 5,614 61.72 54.42
88%
41 Other Works 4,351 73.96 48.85
66%
42 Constr of Food Grain storage 4,054 205.83 186.56
91%
43 Repair & Maint of Bund 3,321 106.92 88.78
83%
44 Constr of Kitchen Shed 3,249 15.14 12.10
80%
45 Nursery Development 3,130 110.82 36.27
33%
46 Deepening / Desilting of Flood Channels 3,075 157.01 68.28
44%
47 Repair & maint of Percolation Tank 2,990 147.76 124.30
84%
48 Construction of Embankment 2,305 155.82 131.91
85%
49 Construction of Spur 2,110 110.22 93.42
85%
50 Repaire and Maint of NADEP/Vermi Compost Pit 2,074 10.98 9.33
85%
51 Construction of Canal 1,811 78.40 61.96
79%
52 Construction of Fish Drying Infrastructure 1,801 56.19 46.08
82%
53 Construction of Other Community Building/Assets 1,761 43.88 29.73
68%
54 Construction of building/workshed for SHG 1,704 53.34 46.48
87%
55 Grass Land Development 1,415 71.04 41.71
59%
56 Bio-Fertilizer 1,328 18.27 14.06
77%
57 Renovation of Canal 1,247 33.39 24.76
74%
58 Repair & Maint of Canal 1,163 29.83 23.12
78%
59 Lining of Canal 766 39.90 32.09
80%
60 Strengthening of Embankment 674 23.75 22.38
94%
61 Fish Culture 404 18.45 14.30
78%
62 Construction of Village Haats 375 9.03 8.03
89%
63 Repair & Maint of Fish Drying Infrastructure 292 12.41 10.39
84%
64 Piggery Shelter 252 6.63 5.68
86%
65 Lift Irrigation 146 14.58 9.82
67%
66 Repair & maint of Gully Plugs 97 5.41 4.40
81%
67 Water Converation - Others 47 1.45 1.02
71%
68 Bio-gas plant 41 0.36 0.23
63%
Total 90,25,401 107,702.35 73,400.59
All 68 rows (zero-value rows hidden) ⇩ Export to Excel