MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Completion Progress

Completed in 2026-2027
4,68,798
— started this same FY
24,191
5%
— started in an earlier FY
4,44,607
95% — carried over
Physically done, closure pending (statewide)
4,29,247
This period's completions, by original start year
2025-2026
2,89,702
2024-2025
75,828
2023-2024
35,546
2026-2027
24,191
2021-2022
13,676
2022-2023
13,652
Completions by month, FY 2026-2027
Mar
Apr
May
Jun
Jul
Aug

Detailed breakdown

By District By New Work Type
Sr. New Work Type Completed this period — started same FY — carried over
1 Rural Housing 2,43,956 23,609 2,20,347
2 Well Recharge 51,820 14 51,806
3 Farm Pond 50,173 72 50,101
4 Plantation 23,419 2 23,417
5 Construction of Bund 12,983 32 12,951
6 Construction of Tank 11,138 69 11,069
7 Construction of Well 10,746 32 10,714
8 Construction of Recharge Pits 9,476 14 9,462
9 Construction of Check Dam/Stop Dam 8,622 32 8,590
10 Construction of Percolation Tank 6,222 13 6,209
11 Constr of Cement Concrete Roads 6,113 138 5,975
12 Construction of Trench 4,734 10 4,724
13 Land Development 4,706 5 4,701
14 Repair & maint of Pond/ Tank 2,552 1 2,551
15 Solid and Liquid Waste Management 2,298 23 2,275
16 Cattle Shed 2,026 62 1,964
17 Construction of Road and Culvert 1,735 5 1,730
18 Construction of NADEP/Vermi Compost Pit 1,734 5 1,729
19 Constr of Gabion 1,246 0 1,246
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1,090 2 1,088
21 Roof Water Harvesting on gov/panchayat bldg 1,020 13 1,007
22 Boulder Check/Gully Plug 927 2 925
23 Works for Flood Control and Protection 777 3 774
24 Constr of Aganwadi 718 7 711
25 Constr of GP Bhawan 655 1 654
26 Construction of Crematorium 599 4 595
27 Grass Land Development 559 0 559
28 Culvert 539 4 535
29 Community Sanitary Complex 536 5 531
30 Terracing 491 0 491
31 Nursery Development 400 1 399
32 Constr of Compound wall 390 1 389
33 Repair & maint of Road 346 0 346
34 Repair & maint of Water Harvesting Structures 329 0 329
35 Repair & Maint of Check Dam/Stop Dam 305 0 305
36 Repair & maint of Percolation Tank 284 0 284
37 Construction of Fish Drying Infrastructure 232 0 232
38 Construction of Toilets 223 0 223
39 Construction of Canal 217 4 213
40 Construction of building/workshed for SHG 209 3 206
41 Construction of Embankment 203 0 203
42 Underground Dyke for Ground Water Recharge 191 0 191
43 Goat Shelter 188 1 187
44 Other Works 184 0 184
45 Construction of Play field 171 0 171
46 Bio-Fertilizer 169 1 168
47 Poultry Shelter 169 1 168
48 Constr of Food Grain storage 166 0 166
49 Repair & Maint of Bund 160 0 160
50 Repair & Maint of Community infrastructure 102 0 102
51 Construction of Spur 100 0 100
52 Constr of Kitchen Shed 92 0 92
53 Repaire and Maint of NADEP/Vermi Compost Pit 70 0 70
54 Lining of Canal 67 0 67
55 Renovation of Canal 66 0 66
56 Construction of Other Community Building/Assets 51 0 51
57 Repair & Maint of Canal 37 0 37
58 Construction of Village Haats 23 0 23
59 Piggery Shelter 13 0 13
60 Bio-gas plant 13 0 13
61 Renovation of traditional water bodies 9 0 9
62 Repair & maint of Gully Plugs 4 0 4
63 Repair & Maint of Fish Drying Infrastructure 3 0 3
64 Lift Irrigation 2 0 2
Total 4,68,798 24,191 4,44,607
All 64 rows (zero-value rows hidden) ⇩ Export to Excel