Completed in 2026-2027
742
— started this same FY
2
0%
— started in an earlier FY
740
100% — carried over
Physically done, closure pending
748
This period's completions, by original start year
2025-2026
483
2024-2025
110
2023-2024
59
2022-2023
46
2021-2022
24
2020-2021
14
Completions by month, FY 2026-2027
Mar
Apr
May
Jun

Detailed breakdown

By Panchayat By New Work Type
Sr. New Work Type Completed this period — started same FY — carried over
1 Rural Housing 227 2 225
2 Farm Pond 163 0 163
3 Construction of Bund 84 0 84
4 Well Recharge 75 0 75
5 Construction of Recharge Pits 62 0 62
6 Plantation 29 0 29
7 Land Development 26 0 26
8 Construction of Check Dam/Stop Dam 22 0 22
9 Repair & maint of Pond/ Tank 11 0 11
10 Construction of Tank 8 0 8
11 Repair & maint of Water Harvesting Structures 5 0 5
12 Construction of Trench 4 0 4
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0 4
14 Construction of Well 4 0 4
15 Solid and Liquid Waste Management 3 0 3
16 Other Works 3 0 3
17 Terracing 2 0 2
18 Repair & Maint of Check Dam/Stop Dam 2 0 2
19 Constr of Gabion 1 0 1
20 Construction of Percolation Tank 1 0 1
21 Boulder Check/Gully Plug 1 0 1
22 Lining of Canal 1 0 1
23 Construction of NADEP/Vermi Compost Pit 1 0 1
24 Repaire and Maint of NADEP/Vermi Compost Pit 1 0 1
25 Roof Water Harvesting on gov/panchayat bldg 1 0 1
26 Construction of Road and Culvert 1 0 1
Total 742 2 740
All 26 rows (zero-value rows hidden) ⇩ Export to Excel